Circuito ZFSP01

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación A A A A A A A A A A A A
Clientes 2309 2309 1878 2366 2084 2085 2058 2199 2016 2019 1967 1286
% Nivel Cobranza 0.00% 96.65% 97.46% 96.48% 102.29% 97.20% 93.27% 92.80% 98.05% 92.34% 94.07% 105.77%
% Nivel Pérdida 0.00% 30.93% 28.33% 29.59% 25.29% 30.90% 33.05% 33.02% 34.11% 28.42% 64.66% 31.97%
Energía Suministrada (GWh) 0 5.12 5 4.92 4.70 5.59 5.70 5.42 5.11 4.71 4.73 4.24
Energía Facturada (GWh) 0 3.54 3.58 3.47 3.51 3.86 3.81 3.63 3.37 3.37 1.67 2.88
Energía Cobrada (GWh) 0 3.42 3.49 3.34 3.59 3.76 3.56 3.37 3.30 3.11 1.57 3.05
% Servicio 98.60% 99.59% 98.57% 96.87% 99.51% 99.35% 99.90% 99.37% 99.62% 97.78% 98.39% 99.84%
% Sin Servicio 1.40% 0.41% 1.43% 3.13% 0.49% 0.65% 0.10% 0.63% 0.38% 2.22% 1.61% 0.16%
Interrupción Programada (Hrs) 6.00 0.00 0.00 11.00 0.00 5.00 4.00 12.00 6.00 18.00 10.00 0.00
Interrupción Ejecutada (Hrs) 10.05 3.07 10.45 22.85 3.57 4.75 0.75 4.60 2.80 16.23 11.72 1.13
Promedio Interrupción Diarias (Hrs) 0.33 0.10 0.34 0.75 0.12 0.16 0.02 0.15 0.09 0.53 0.39 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

PROYECTO PORVENIR, PLAN PORVENIR, LOS MULTIS, VILLA CESARINA, VILLA AZUCARADA, PETROPOLIS II, PETROPOLIS I, BATEY LA ESPERANZA, RES PRADERAS DE SAN PEDRO, EL PEÑON, BATEY EL MOLENITO, BOCA DEL SOCO, EL RINCON, LA SIERRA, BATEY VILLA LOS ARADOS, BATEY EL SOCO, LAGUNA PRIETA.