Circuito ZFSP01

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación A A A A A A A A A A A A
Clientes 2084 2085 2058 2199 2016 2019 1967 1286 1870 1859 1834 1187
% Nivel Cobranza 0.00% 97.20% 93.27% 92.80% 98.05% 92.34% 94.07% 105.77% 97.47% 96.60% 106.91% 96.90%
% Nivel Pérdida 0.00% 30.90% 33.05% 33.02% 34.11% 28.42% 64.66% 31.97% 28.36% 9.64% 12.95% 20.89%
Energía Suministrada (GWh) 0 5.59 5.70 5.42 5.11 4.71 4.73 4.24 4.61 3.79 3.61 4.28
Energía Facturada (GWh) 0 3.86 3.81 3.63 3.37 3.37 1.67 2.88 3.30 3.43 3.14 3.38
Energía Cobrada (GWh) 0 3.76 3.56 3.37 3.30 3.11 1.57 3.05 3.22 3.31 3.36 3.28
% Servicio 99.51% 99.35% 99.90% 99.37% 99.62% 97.78% 98.39% 99.84% 99.18% 99.10% 98.99% 99.83%
% Sin Servicio 0.49% 0.65% 0.10% 0.63% 0.38% 2.22% 1.61% 0.16% 0.82% 0.90% 1.01% 0.17%
Interrupción Programada (Hrs) 0.00 5.00 4.00 12.00 6.00 18.00 10.00 0.00 5.00 0.00 10.00 0.00
Interrupción Ejecutada (Hrs) 3.57 4.75 0.75 4.60 2.80 16.23 11.72 1.13 5.97 6.60 7.37 1.27
Promedio Interrupción Diarias (Hrs) 0.12 0.16 0.02 0.15 0.09 0.53 0.39 0.04 0.20 0.22 0.24 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

PROYECTO PORVENIR, PLAN PORVENIR, LOS MULTIS, VILLA CESARINA, VILLA AZUCARADA, PETROPOLIS II, PETROPOLIS I, BATEY LA ESPERANZA, RES PRADERAS DE SAN PEDRO, EL PEÑON, BATEY EL MOLENITO, BOCA DEL SOCO, EL RINCON, LA SIERRA, BATEY VILLA LOS ARADOS, BATEY EL SOCO, LAGUNA PRIETA.