Buscar Circuitos Glosario

Circuito ZFAL103

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 165 165 186 186 184 183 177 161 163 159 159 162
% Nivel Cobranza 0.00% 96.18% 94.02% 80.42% 82.27% 71.15% 97.75% 90.44% 111.06% 136.44% 72.11% 100.96%
% Nivel Pérdida 0.00% 8.93% 12.60% -15.25% 4.27% 14.78% 15.30% 9.22% 17.22% -4.75% 2.35% 4.74%
Energía Suministrada (GWh) 0 0.69 0.69 0.64 0.60 0.52 0.53 0.46 0.45 0.43 0.5 0.57
Energía Facturada (GWh) 0 0.63 0.60 0.73 0.57 0.44 0.45 0.42 0.37 0.45 0.49 0.54
Energía Cobrada (GWh) 0 0.61 0.57 0.59 0.47 0.32 0.44 0.38 0.41 0.62 0.35 0.55
% Servicio 99.56% 98.92% 98.44% 98.84% 98.87% 98.87% 99.73% 98.70% 99.60% 99.10% 98.24% 99.07%
% Sin Servicio 0.44% 1.08% 1.56% 1.16% 1.13% 1.13% 0.27% 1.30% 0.40% 0.90% 1.76% 0.93%
Interrupción Programada (Hrs) 0.00 0.00 3.00 0.00 0.00 0.00 0.00 1.00 0.00 5.00 0.00 3.00
Interrupción Ejecutada (Hrs) 3.18 7.78 11.26 8.33 8.11 8.11 1.94 9.33 2.86 6.73 12.87 6.79
Promedio Interrupción Diarias (Hrs) 0.10 0.26 0.37 0.27 0.27 0.27 0.06 0.31 0.09 0.22 0.42 0.22
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito ZFAL103
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 11.08
% Ejecución Operativa 277.00%
Detalle de Salidas - Circuito ZFAL103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
17/10/2026 Programada 09:00:00 13:00:00 4.00 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
17/10/2026 Ejecutada 10:23:41 15:42:13 5.52 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
17/10/2026 Ejecutada 09:32:14 09:44:53 5.52 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
13/10/2026 Ejecutada 06:36:54 06:39:34 0.04 FALLA TRANSITORIA //
Zona Franca De Los Alcarrizos, Hospital Vinicio Calventi, Zona Franca Hato Nuevo, Hospital Los Americanos, Dr. Elías Santana.