Buscar Circuitos Glosario

Circuito VPAN101

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 4424 4424 4408 4408 4367 4347 4371 4371 4365 4375 4347 4325
% Nivel Cobranza 0.00% 62.42% 68.64% 78.56% 70.08% 68.47% 68.08% 71.87% 70.35% 67.67% 68.90% 78.29%
% Nivel Pérdida 0.00% 67.59% 67.99% 69.15% 63.52% 68.47% 70.37% 70.93% 70.56% 71.71% 71.15% 73.86%
Energía Suministrada (GWh) 0 3.01 2.66 2.60 2.36 2.70 2.72 2.64 2.75 2.87 2.91 3.13
Energía Facturada (GWh) 0 0.98 0.85 0.80 0.86 0.85 0.81 0.77 0.81 0.81 0.84 0.82
Energía Cobrada (GWh) 0 0.61 0.58 0.63 0.60 0.58 0.55 0.55 0.57 0.55 0.58 0.64
% Servicio 98.86% 98.62% 98.62% 94.79% 97.62% 99.57% 98.42% 97.51% 97.72% 95.40% 94.92% 97.89%
% Sin Servicio 1.14% 1.38% 1.38% 5.21% 2.38% 0.43% 1.58% 2.49% 2.28% 4.60% 5.08% 2.11%
Interrupción Programada (Hrs) 0.00 0.00 0.00 8.00 4.00 0.00 0.00 0.00 8.00 11.00 4.00 4.00
Interrupción Ejecutada (Hrs) 8.23 9.95 9.95 37.49 17.12 3.07 11.76 18.16 16.66 33.60 37.09 15.43
Promedio Interrupción Diarias (Hrs) 0.27 0.33 0.33 1.23 0.56 0.10 0.39 0.60 0.55 1.10 1.22 0.51
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito VPAN101
Interrupciones Programadas 0
Interrupciones Ejecutadas 15.28
% Ejecución Operativa 0%
Detalle de Salidas - Circuito VPAN101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Programada 00:00:00 00:00:00 0
07/07/2026 Programada 00:00:00 00:00:00 0
07/07/2026 Programada 00:00:00 00:00:00 0
06/07/2026 Programada 00:00:00 00:00:00 0
06/07/2026 Programada 00:00:00 00:00:00 0
06/07/2026 Programada 00:00:00 00:00:00 0
05/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Ejecutada 23:32:37 23:38:10 0.65 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Ejecutada 22:46:34 23:10:25 0.65 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Ejecutada 11:22:59 11:28:47 0.65 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
05/07/2026 Ejecutada 00:28:11 00:31:41 0.65 FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN CONECTOR
04/07/2026 Programada 00:00:00 00:00:00 0
04/07/2026 Programada 00:00:00 00:00:00 0
04/07/2026 Programada 00:00:00 00:00:00 0
03/07/2026 Programada 00:00:00 00:00:00 0
03/07/2026 Programada 00:00:00 00:00:00 0
03/07/2026 Programada 00:00:00 00:00:00 0
02/07/2026 Programada 00:00:00 00:00:00 0 PREVENTIVO PODA // PREVENTIVO PODA //
02/07/2026 Programada 00:00:00 00:00:00 0 PREVENTIVO PODA // PREVENTIVO PODA //
02/07/2026 Programada 00:00:00 00:00:00 0 PREVENTIVO PODA // PREVENTIVO PODA //
02/07/2026 Ejecutada 16:13:33 16:52:38 5.95 PREVENTIVO PODA // PREVENTIVO PODA //
02/07/2026 Ejecutada 10:11:55 15:30:03 5.95 PREVENTIVO PODA // PREVENTIVO PODA //
01/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA //
01/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA //
01/07/2026 Programada 00:00:00 00:00:00 0 FALLA TRANSITORIA // FALLA TRANSITORIA //
01/07/2026 Ejecutada 22:16:58 22:24:17 0.39 FALLA TRANSITORIA // FALLA TRANSITORIA //
01/07/2026 Ejecutada 16:32:42 16:48:30 0.39 FALLA TRANSITORIA // FALLA TRANSITORIA //
Villarpando, La Canoa, El Coroso, la mallita, los Toros, La Guanábana, Amiama Gomez, Tábara Arriba, Canoa, Bastida, Arroyo Salado, Las Yayas de Viajama, Orégano Grande, Magueyal, Hato Nuevo, Las Yayas Arriba, Vietnam, Las Yayas Abajo, Sajanoa, El Cruce de las Yayas, Carretera Sanchez hacia Azua.