Buscar Circuitos Glosario

Circuito VOLG103

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 6905 6905 6895 6871 6859 6856 6827 6808 6822 6808 6799 6785
% Nivel Cobranza 0.00% 90.93% 89.16% 88.87% 112.17% 98.43% 100.90% 109.22% 103.55% 106.43% 91.46% 94.16%
% Nivel Pérdida 0.00% 17.05% 18.17% 10.64% 19.89% -2.00% 10.33% 6.18% 2.99% 7.71% 5.94% 18.73%
Energía Suministrada (GWh) 0 3.25 2.92 2.4 2.32 2.08 2.39 2.46 2.63 3.12 3.23 3.51
Energía Facturada (GWh) 0 2.69 2.39 2.15 1.86 2.12 2.15 2.31 2.55 2.88 3.04 2.85
Energía Cobrada (GWh) 0 2.45 2.13 1.91 2.09 2.08 2.17 2.52 2.65 3.06 2.78 2.69
% Servicio 99.94% 98.84% 99.95% 99.93% 99.84% 99.02% 99.99% 99.78% 98.65% 99.27% 99.98% 100.00%
% Sin Servicio 0.06% 1.16% 0.05% 0.07% 0.16% 0.98% 0.01% 0.22% 1.35% 0.73% 0.02% 0.00%
Interrupción Programada (Hrs) 0.00 5.00 0.00 6.00 0.00 6.00 0.00 4.00 0.00 4.00 4.00 8.00
Interrupción Ejecutada (Hrs) 0.46 8.34 0.38 0.53 1.12 7.09 0.07 1.64 9.84 5.32 0.11 0.00
Promedio Interrupción Diarias (Hrs) 0.02 0.27 0.01 0.02 0.04 0.23 0.00 0.05 0.32 0.17 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito VOLG103
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.86
% Ejecución Operativa 0%
Detalle de Salidas - Circuito VOLG103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
15/07/2026 Ejecutada 14:40:56 14:44:39 0.06 DISPARO DESCONOCIDO
10/07/2026 Ejecutada 15:56:43 16:07:12 0.4 PODA PREVENTIVO
10/07/2026 Ejecutada 12:25:09 12:38:25 0.4 PODA PREVENTIVO
El embrujo II y Embrujo III, El Despertal (Parcial), La autopista Duarte Hasta el HOMS, Villa Maria (Parcial), El Rosal, PUCMM (UNR), Reparto Imperial, Quintas de Rincón Largo.