Buscar Circuitos Glosario

Circuito VDU805

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 2208 2208 2197 2210 2238 2198 2222 2190 2209 2203 2224 2184
% Nivel Cobranza 0.00% 83.63% 82.16% 105.08% 85.63% 95.02% 96.24% 107.18% 92.84% 80.92% 82.00% 98.55%
% Nivel Pérdida 0.00% 80.86% 78.59% 79.01% 74.76% 76.61% 78.30% 79.69% 77.98% 79.90% 81.69% 81.49%
Energía Suministrada (GWh) 0 2.31 1.88 1.74 1.56 1.75 1.88 1.96 2.20 2.44 2.52 2.29
Energía Facturada (GWh) 0 0.44 0.40 0.36 0.39 0.41 0.41 0.40 0.48 0.49 0.46 0.42
Energía Cobrada (GWh) 0 0.37 0.33 0.38 0.34 0.39 0.39 0.43 0.45 0.40 0.38 0.42
% Servicio 96.61% 98.22% 98.33% 99.31% 97.89% 99.91% 98.82% 97.01% 98.98% 99.66% 96.42% 97.42%
% Sin Servicio 3.39% 1.78% 1.67% 0.69% 2.11% 0.09% 1.18% 2.99% 1.02% 0.34% 3.58% 2.58%
Interrupción Programada (Hrs) 36.00 6.00 18.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 16.00
Interrupción Ejecutada (Hrs) 24.42 12.83 12.02 4.98 15.20 0.63 8.75 21.85 7.47 2.52 26.15 18.87
Promedio Interrupción Diarias (Hrs) 0.80 0.42 0.40 0.16 0.50 0.02 0.29 0.72 0.25 0.08 0.86 0.62
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito VDU805
Interrupciones Programadas 12.00
Interrupciones Ejecutadas 21.14
% Ejecución Operativa 176.17%
Detalle de Salidas - Circuito VDU805
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
03/07/2026 Programada 10:20:00 16:20:00 6.00 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
03/07/2026 Ejecutada 10:12:00 16:44:00 6.62 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
03/07/2026 Ejecutada 09:03:00 09:08:00 6.62 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
01/07/2026 Ejecutada 08:21:00 08:28:00 0.12 DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO
30/06/2026 Programada 09:20:00 15:20:00 6.00 DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR
30/06/2026 Ejecutada 12:55:00 16:17:00 3.67 DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR
30/06/2026 Ejecutada 10:18:00 10:36:00 3.67 DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (MANTTO. PREV.) - AC - MANTTO. PREV. EN CONDUCTOR
28/06/2026 Ejecutada 19:12:00 19:18:00 0.22 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
28/06/2026 Ejecutada 00:43:00 00:50:00 0.22 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
LA FRANCIA, VILLA DUARTE, RES FLOR DEL FARO, PARQUE DEL ESTE II, MARQUITERIA, LOS MOLINOS, LOS MAMEYES.