Circuito VALT102A
Distribuidora EdeSur - Provincia San Cristóbal
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 735 | 735 | 717 | 730 | 723 | 731 | 730 | 730 | 1551 | 1558 | 1554 | 1499 |
| % Nivel Cobranza | 0.00% | 96.13% | 86.31% | 97.66% | 84.38% | 84.69% | 90.74% | 84.90% | 77.65% | 71.66% | 71.25% | 68.07% |
| % Nivel Pérdida | 0.00% | 68.91% | 67.18% | 69.45% | 63.85% | 65.64% | 64.37% | 67.17% | 73.00% | 70.55% | 74.69% | 72.04% |
| Energía Suministrada (GWh) | 0 | 0.49 | 0.48 | 0.48 | 0.45 | 0.47 | 0.44 | 0.48 | 1.15 | 1.11 | 1.2 | 1.14 |
| Energía Facturada (GWh) | 0 | 0.15 | 0.16 | 0.15 | 0.16 | 0.16 | 0.16 | 0.16 | 0.31 | 0.33 | 0.3 | 0.32 |
| Energía Cobrada (GWh) | 0 | 0.15 | 0.14 | 0.14 | 0.14 | 0.14 | 0.14 | 0.13 | 0.24 | 0.24 | 0.22 | 0.22 |
| % Servicio | 94.36% | 95.45% | 95.45% | 94.26% | 96.47% | 97.24% | 97.87% | 97.35% | 94.82% | 92.97% | 93.34% | 95.27% |
| % Sin Servicio | 5.64% | 4.55% | 4.55% | 5.74% | 3.53% | 2.76% | 2.13% | 2.65% | 5.18% | 7.03% | 6.66% | 4.73% |
| Interrupción Programada (Hrs) | 8.00 | 12.00 | 12.00 | 13.00 | 8.00 | 8.00 | 8.00 | 6.00 | 12.00 | 4.00 | 6.00 | 8.00 |
| Interrupción Ejecutada (Hrs) | 40.59 | 32.76 | 32.76 | 41.34 | 25.39 | 19.86 | 15.86 | 19.33 | 37.81 | 51.28 | 48.61 | 34.55 |
| Promedio Interrupción Diarias (Hrs) | 1.33 | 1.08 | 1.08 | 1.36 | 0.83 | 0.65 | 0.52 | 0.64 | 1.24 | 1.69 | 1.60 | 1.14 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 07/07/2026 | Ejecutada | 15:17:48 | 16:04:09 | 0.77 | ARBOL CORTADO SOBRE LINEA // |
| 06/07/2026 | Programada | 13:00:00 | 15:00:00 | 2.00 | FALLA TRANSITORIA // FALLA TRANSITORIA // EN MANTENIMIENTO |
| 06/07/2026 | Ejecutada | 13:01:05 | 14:16:44 | 1.75 | FALLA TRANSITORIA // FALLA TRANSITORIA // EN MANTENIMIENTO |
| 06/07/2026 | Ejecutada | 09:57:24 | 10:08:52 | 1.75 | FALLA TRANSITORIA // FALLA TRANSITORIA // EN MANTENIMIENTO |
| 06/07/2026 | Ejecutada | 00:59:56 | 01:17:32 | 1.75 | FALLA TRANSITORIA // FALLA TRANSITORIA // EN MANTENIMIENTO |
| 05/07/2026 | Ejecutada | 02:35:58 | 02:52:20 | 0.33 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // |
| 05/07/2026 | Ejecutada | 01:47:24 | 01:50:55 | 0.33 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // |
| 04/07/2026 | Ejecutada | 17:49:56 | 18:47:32 | 1.60 | FALLA TRANSITORIA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 04/07/2026 | Ejecutada | 16:16:20 | 16:42:36 | 1.60 | FALLA TRANSITORIA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 04/07/2026 | Ejecutada | 15:43:08 | 15:55:24 | 1.60 | FALLA TRANSITORIA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 03/07/2026 | Ejecutada | 16:27:16 | 16:33:00 | 0.10 | FALLA TRANSITORIA // |
| 02/07/2026 | Ejecutada | 19:35:56 | 19:46:12 | 0.92 | DETERIORO // DETERIORO // |
| 02/07/2026 | Ejecutada | 15:48:28 | 16:33:09 | 0.92 | DETERIORO // DETERIORO // |
| 01/07/2026 | Programada | 08:00:00 | 10:00:00 | 2.00 | EN MANTENIMIENTO // |
| 01/07/2026 | Ejecutada | 08:03:48 | 10:57:57 | 2.90 | EN MANTENIMIENTO // |