Circuito VAJU101

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 2046 2046 2042 2052 2045 2040 2058 2058 2040 2032 2002 1987
% Nivel Cobranza 0.00% 119.24% 89.25% 91.33% 97.90% 94.76% 88.09% 106.97% 104.17% 96.05% 88.44% 88.54%
% Nivel Pérdida 0.00% 52.64% 25.33% 35.04% 34.70% 39.86% 45.06% 42.84% 33.49% 35.37% 35.00% 41.21%
Energía Suministrada (GWh) 0 0.53 0.45 0.50 0.44 0.48 0.49 0.44 0.45 0.49 0.53 0.56
Energía Facturada (GWh) 0 0.25 0.33 0.32 0.29 0.29 0.27 0.25 0.30 0.32 0.34 0.33
Energía Cobrada (GWh) 0 0.3 0.30 0.29 0.28 0.27 0.24 0.27 0.31 0.31 0.3 0.29
% Servicio 98.51% 99.96% 99.96% 99.80% 98.61% 99.28% 99.22% 98.15% 98.89% 99.32% 99.30% 98.42%
% Sin Servicio 1.49% 0.04% 0.04% 0.20% 1.39% 0.72% 0.78% 1.85% 1.11% 0.68% 0.70% 1.58%
Interrupción Programada (Hrs) 4.00 0.00 0.00 0.00 0.00 2.00 3.00 7.00 0.00 0.00 4.00 5.00
Interrupción Ejecutada (Hrs) 10.73 0.32 0.32 1.43 10.01 5.21 5.78 13.47 8.08 4.93 5.11 11.50
Promedio Interrupción Diarias (Hrs) 0.35 0.01 0.01 0.05 0.33 0.17 0.19 0.44 0.27 0.16 0.17 0.38
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito VAJU101
Interrupciones Programadas 5.00
Interrupciones Ejecutadas 4.75
% Ejecución Operativa 95.00%
Detalle de Salidas - Circuito VAJU101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
04/07/2026 Programada 15:00:00 18:00:00 3.00 MANTENIMIENTO ETED //
04/07/2026 Ejecutada 15:00:52 17:02:52 2.03 MANTENIMIENTO ETED //
02/07/2026 Programada 16:00:00 18:00:00 2.00 EN MANTENIMIENTO //
02/07/2026 Ejecutada 16:19:56 19:03:16 2.72 EN MANTENIMIENTO //
Sonador, Cabeza de Toro, El Rosario, Cardón, El Capa, Las Yayitas, Pueblo Nuevo.