Circuito UASD107

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación A A A A A D C A A A A D
Clientes 1484 1484 1466 1461 1461 1456 1457 1460 1459 1456 1453 1450
% Nivel Cobranza 0.00% 104.61% 92.05% 105.83% 74.10% 137.86% 75.59% 115.06% 94.96% 96.36% 103.10% 126.07%
% Nivel Pérdida 0.00% 0.94% 3.07% 7.83% 13.56% 6.08% -4.80% 11.42% 8.10% -5.92% -5.10% -11.69%
Energía Suministrada (GWh) 0 3.52 3.69 3.69 3.58 3.14 3.27 2.92 3.19 2.61 2.65 2.71
Energía Facturada (GWh) 0 3.49 3.58 3.41 3.1 2.95 3.42 2.59 2.93 2.77 2.79 3.03
Energía Cobrada (GWh) 0 3.65 3.29 3.6 2.3 4.06 2.59 2.98 2.78 2.67 2.87 3.82
% Servicio 98.48% 99.05% 99.98% 99.83% 99.99% 99.69% 99.55% 99.61% 99.76% 99.98% 99.80% 99.95%
% Sin Servicio 1.52% 0.95% 0.02% 0.17% 0.01% 0.31% 0.45% 0.39% 0.24% 0.02% 0.20% 0.05%
Interrupción Programada (Hrs) 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00
Interrupción Ejecutada (Hrs) 11.10 6.93 0.17 1.24 0.06 2.25 3.25 2.87 1.76 0.14 1.48 0.33
Promedio Interrupción Diarias (Hrs) 0.36 0.23 0.01 0.04 0.00 0.07 0.11 0.09 0.06 0.00 0.05 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Zona Universitaria (Parcial): Paseo de los Médicos (Parcial), Wascar Tejeda (Parcial), Rafael Ravelo, Dr. Piñeyro (Parcial), Wenceslao Álvarez (Parcial), Malecón Center, Máximo Gómez (Embajada de Argentina y Hotel Continental), Av. Independencia (Parcial), Hotel Santo Domingo, Ministerio de Relaciones Exteriores, Hotel Hilton, Hospital de la Policía Nacional, Malecon Center.