Circuito UASD107

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación A A A A A A A D C A A A
Clientes 1515 1482 1482 1484 1466 1461 1461 1456 1457 1460 1459 1456
% Nivel Cobranza 0.00% 0.00% 100.40% 104.61% 92.05% 105.83% 74.10% 137.86% 75.59% 115.06% 94.96% 96.36%
% Nivel Pérdida 0.00% 0.00% -3.09% 0.94% 3.07% 7.83% 13.56% 6.08% -4.80% 11.42% 8.10% -5.92%
Energía Suministrada (GWh) 0 0 3.18 3.52 3.69 3.69 3.58 3.14 3.27 2.92 3.19 2.61
Energía Facturada (GWh) 0 0 3.28 3.49 3.58 3.41 3.1 2.95 3.42 2.59 2.93 2.77
Energía Cobrada (GWh) 0 0 3.30 3.65 3.29 3.6 2.3 4.06 2.59 2.98 2.78 2.67
% Servicio 100.00% 99.98% 98.48% 99.05% 99.98% 99.83% 99.99% 99.69% 99.55% 99.61% 99.76% 99.98%
% Sin Servicio 0.00% 0.02% 1.52% 0.95% 0.02% 0.17% 0.01% 0.31% 0.45% 0.39% 0.24% 0.02%
Interrupción Programada (Hrs) 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.12 11.10 6.93 0.17 1.24 0.06 2.25 3.25 2.87 1.76 0.14
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.36 0.23 0.01 0.04 0.00 0.07 0.11 0.09 0.06 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Zona Universitaria (Parcial): Paseo de los Médicos (Parcial), Wascar Tejeda (Parcial), Rafael Ravelo, Dr. Piñeyro (Parcial), Wenceslao Álvarez (Parcial), Malecón Center, Máximo Gómez (Embajada de Argentina y Hotel Continental), Av. Independencia (Parcial), Hotel Santo Domingo, Ministerio de Relaciones Exteriores, Hotel Hilton, Hospital de la Policía Nacional, Malecon Center.