Circuito UASD105C
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | D | A | A | D | A |
Clientes | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 125 | 125 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 99.24% | 98.89% | 100.00% | 99.47% | 99.85% | 99.48% | 98.74% | 99.98% | 100.00% |
% Sin Servicio | 0.76% | 1.11% | 0.00% | 0.53% | 0.15% | 0.52% | 1.26% | 0.02% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 5.58 | 8.12 | 0.00 | 3.89 | 1.06 | 3.79 | 9.19 | 0.12 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.18 | 0.27 | 0.00 | 0.13 | 0.04 | 0.12 | 0.30 | 0.00 | 0.00 |
La Esperilla (parcial), C/ Pedro Henriquez Ureña, C/ José Andrés Aybar Castellano, Ens. Naco (parcial).