Buscar Circuitos Glosario

Circuito UASD105C

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 1221 1221 1221 1221 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
% Servicio 99.74% 100.00% 98.98% 99.79% 99.51% 99.51% 99.81% 99.87% 99.79% 99.99% 99.65% 100.00%
% Sin Servicio 0.26% 0.00% 1.02% 0.21% 0.49% 0.49% 0.19% 0.13% 0.21% 0.01% 0.35% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.85 0.03 7.32 1.49 3.56 3.56 1.36 0.91 1.54 0.09 2.56 0.00
Promedio Interrupción Diarias (Hrs) 0.06 0.00 0.24 0.05 0.12 0.12 0.04 0.03 0.05 0.00 0.08 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito UASD105C
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.06
% Ejecución Operativa 0%
Detalle de Salidas - Circuito UASD105C
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Ejecutada 02:15:40 02:19:21 0.06 FALLA TRANSITORIA //
La Esperilla (parcial), C/ Pedro Henriquez Ureña, C/ José Andrés Aybar Castellano, Ens. Naco (parcial).