Circuito UASD104A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación A A A A A D C A A A A D
Clientes 63 63 61 60 61 62 1 1 63 63 63 63
% Nivel Cobranza 0.00% 101.05% 99.68% 112.97% 85.15% 87.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% -13.38% 7.58% 1.07% 16.02% 4.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 1.03 1.28 1.19 1.32 1.17 0 0 0 0 0 0
Energía Facturada (GWh) 0 1.17 1.19 1.18 1.11 1.13 0 0 0 0 0 0
Energía Cobrada (GWh) 0 1.18 1.18 1.34 0.95 0.98 0 0 0 0 0 0
% Servicio 99.96% 99.99% 100.00% 99.53% 100.00% 100.00% 99.99% 100.00% 100.00% 100.00% 100.00% 100.00%
% Sin Servicio 0.04% 0.01% 0.00% 0.47% 0.00% 0.00% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 0.28 0.06 0.00 3.42 0.00 0.00 0.09 0.00 0.02 0.00 0.01 0.00
Promedio Interrupción Diarias (Hrs) 0.01 0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro de los Héroes, Hospital Infantil Robert Read Cabral.