Buscar Circuitos Glosario

Circuito UASD104

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 655 655 661 663 665 666 668 668 601 605 604 602
% Nivel Cobranza 0.00% 106.50% 94.98% 97.92% 100.34% 107.09% 107.45% 102.16% 107.01% 90.99% 92.04% 106.83%
% Nivel Pérdida 0.00% 20.96% 13.42% 21.43% -1.94% -68.83% -66.15% -29.16% 17.91% 12.08% 17.90% 18.86%
Energía Suministrada (GWh) 0 2.76 2.40 2.39 1.86 1.24 1.42 1.98 1.83 1.77 1.86 1.77
Energía Facturada (GWh) 0 2.18 2.08 1.88 1.90 2.10 2.37 2.55 1.50 1.55 1.53 1.43
Energía Cobrada (GWh) 0 2.32 1.98 1.84 1.90 2.25 2.54 2.61 1.61 1.41 1.41 1.53
% Servicio 100.00% 99.97% 99.97% 99.79% 99.17% 99.99% 100.00% 99.35% 99.84% 100.00% 99.68% 100.00%
% Sin Servicio 0.00% 0.03% 0.03% 0.21% 0.83% 0.01% 0.00% 0.65% 0.16% 0.00% 0.32% 0.00%
Interrupción Programada (Hrs) 1.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.20 0.20 1.51 5.97 0.06 0.00 4.72 1.15 0.00 2.33 0.03
Promedio Interrupción Diarias (Hrs) 0.00 0.01 0.01 0.05 0.20 0.00 0.00 0.16 0.04 0.00 0.08 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito UASD104
Interrupciones Programadas 7.00
Interrupciones Ejecutadas 21.84
% Ejecución Operativa 312.00%
Detalle de Salidas - Circuito UASD104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
02/07/2026 Programada 09:00:00 13:00:00 4.00
01/07/2026 Programada 09:00:00 12:00:00 3.00 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 13:29:36 13:33:30 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 13:27:36 13:29:26 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 13:17:23 13:27:25 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 12:58:11 13:17:06 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 12:45:02 12:57:56 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
01/07/2026 Ejecutada 09:53:49 12:44:27 3.64 APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO // APERTURA SS/EE MANTENIMIENTO
Zona Universitaria (Parcial): Paseo de los Médicos (Parcial), Correa y Cidron desde Paseo de los Médicos hasta la Antonio Maceo, Centro De Los Héroes (Parcial), Abraham Lincoln desde la George Washington hasta llegar prox. a la Antonio De La Maza, Campamento Duarte, Edif. Lotería Nacional, CEA, Ayuntamiento D.N., Teatro Agua y Luz, Liceo Francés, Instituto Cartográfico Dominicano, Centro de los Héroes (parcial), Dirección de Foresta, Dirección Gral. de Pasaportes, Liga Municipal Dominicana, Hospital Robert Read Cabral, Congreso Nacional, Gral. Antonio Duvergé.