Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 429 429 428 427 428 425 427 425 419 419 415 418
% Nivel Cobranza 0.00% 94.88% 88.00% 108.16% 86.56% 101.08% 99.11% 95.13% 107.08% 92.82% 109.20% 94.76%
% Nivel Pérdida 0.00% 49.17% 38.36% 48.49% 25.83% 43.11% 47.38% 36.41% 37.68% 42.65% 48.16% 45.24%
Energía Suministrada (GWh) 0 0.13 0.11 0.11 0.09 0.11 0.12 0.1 0.11 0.13 0.13 0.12
Energía Facturada (GWh) 0 0.07 0.07 0.06 0.07 0.06 0.06 0.06 0.07 0.07 0.07 0.07
Energía Cobrada (GWh) 0 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.06
% Servicio 97.23% 99.54% 98.36% 97.73% 98.20% 98.01% 99.58% 94.69% 98.76% 98.84% 95.27% 98.66%
% Sin Servicio 2.77% 0.46% 1.64% 2.27% 1.80% 1.99% 0.42% 5.31% 1.24% 1.16% 4.73% 1.34%
Interrupción Programada (Hrs) 10.00 11.00 0.00 11.00 5.00 6.00 6.00 10.00 0.00 0.00 23.00 10.00
Interrupción Ejecutada (Hrs) 19.91 3.30 11.80 16.37 12.94 14.32 3.14 38.77 9.04 8.47 34.53 9.76
Promedio Interrupción Diarias (Hrs) 0.65 0.11 0.39 0.54 0.43 0.47 0.10 1.27 0.30 0.28 1.14 0.32
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito TUBA501
Interrupciones Programadas 6
Interrupciones Ejecutadas 40.87
% Ejecución Operativa 681.17%
Detalle de Salidas - Circuito TUBA501
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 17:59:20 18:09:16 0.6 DISPARO DESCONOCIDO // DISPARO DESCONOCIDO 34.5 KV
08/07/2026 Ejecutada 16:57:06 17:10:57 0.6 DISPARO DESCONOCIDO // DISPARO DESCONOCIDO 34.5 KV
08/07/2026 Ejecutada 13:33:44 13:37:15 0.6 DISPARO DESCONOCIDO // DISPARO DESCONOCIDO 34.5 KV
08/07/2026 Ejecutada 13:29:34 13:33:38 0.6 DISPARO DESCONOCIDO // DISPARO DESCONOCIDO 34.5 KV
08/07/2026 Ejecutada 12:42:11 12:46:59 0.6 DISPARO DESCONOCIDO // DISPARO DESCONOCIDO 34.5 KV
07/07/2026 Ejecutada 19:29:27 19:38:17 0.21 DISPARO DESCONOCIDO
07/07/2026 Ejecutada 19:02:52 19:06:25 0.21 DISPARO DESCONOCIDO
06/07/2026 Ejecutada 22:00:11 22:06:27 0.1 DISPARO DESCONOCIDO 34.5 KV
04/07/2026 Ejecutada 17:38:17 19:16:28 10.1 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 16:48:55 16:53:29 10.1 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:18:13 15:41:26 10.1 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
03/07/2026 Programada 10:00:00 16:00:00 6 PODA PREVENTIVO
03/07/2026 Ejecutada 10:23:13 15:56:10 5.55 PODA PREVENTIVO
01/07/2026 Ejecutada 16:24:30 16:46:29 0.5 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO 34.5 KV // FALTA DE TENSION 34.5 KV
01/07/2026 Ejecutada 15:47:13 15:51:37 0.5 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO 34.5 KV // FALTA DE TENSION 34.5 KV
01/07/2026 Ejecutada 15:28:30 15:31:57 0.5 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO 34.5 KV // FALTA DE TENSION 34.5 KV
Tubagua, Palo Blanco, Arroyo Ancho, Gran Parada.