Buscar Circuitos Glosario

Circuito TIRE701

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 2573 2573 2556 2567 2594 2573 2573 2556 2551 2560 2560 2542
% Nivel Cobranza 0.00% 79.16% 95.57% 93.32% 97.70% 111.40% 85.21% 101.74% 94.03% 109.22% 89.20% 90.63%
% Nivel Pérdida 0.00% 43.98% 52.77% 27.19% 50.77% 52.07% 41.07% 53.97% 43.75% 37.47% 35.00% 52.85%
Energía Suministrada (GWh) 0 0.93 0.86 0.59 0.84 0.8 0.73 0.88 0.73 0.66 0.71 0.98
Energía Facturada (GWh) 0 0.52 0.41 0.43 0.41 0.38 0.43 0.41 0.41 0.41 0.46 0.46
Energía Cobrada (GWh) 0 0.41 0.39 0.4 0.4 0.43 0.37 0.41 0.39 0.45 0.41 0.42
% Servicio 98.45% 97.98% 99.99% 99.87% 98.85% 99.59% 100.00% 99.97% 99.03% 99.57% 99.65% 95.39%
% Sin Servicio 1.55% 2.02% 0.01% 0.13% 1.15% 0.41% 0.00% 0.03% 0.97% 0.43% 0.35% 4.61%
Interrupción Programada (Hrs) 0.00 6.00 0.00 0.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00
Interrupción Ejecutada (Hrs) 11.19 14.54 0.08 0.91 8.28 2.98 0.00 0.20 7.10 3.12 2.54 33.64
Promedio Interrupción Diarias (Hrs) 0.37 0.48 0.00 0.03 0.27 0.10 0.00 0.01 0.23 0.10 0.08 1.11
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito TIRE701
Interrupciones Programadas 0
Interrupciones Ejecutadas 10.46
% Ejecución Operativa 0%
Detalle de Salidas - Circuito TIRE701
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
17/08/2026 Ejecutada 15:11:39 15:16:07 0.07 CORRECTIVO EN FUSIBLE
13/08/2026 Ejecutada 07:10:49 16:22:26 9.19 FALLO DE SECCIONADOR SUBESTACIONES
11/08/2026 Ejecutada 19:33:29 20:45:13 1.2 CORRECCION DE PUNTOS CALIENTES
Tireo Arriba, Tireo al Medio, Tireo Abajo, El Café, Suriel, Portezuela, Tireo Abajo.