Circuito TIRE701

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación C C C C C C C C C C C C
Clientes 2573 2573 2573 2556 2551 2560 2560 2542 2572 2566 2558 2558
% Nivel Cobranza 0.00% 111.40% 85.21% 101.74% 94.03% 109.22% 89.20% 90.63% 96.56% 89.64% 98.55% 93.19%
% Nivel Pérdida 0.00% 52.07% 41.07% 53.97% 43.75% 37.47% 35.00% 52.85% 57.82% 53.21% 34.29% 38.09%
Energía Suministrada (GWh) 0 0.8 0.73 0.88 0.73 0.66 0.71 0.98 1.01 0.87 0.61 0.74
Energía Facturada (GWh) 0 0.38 0.43 0.41 0.41 0.41 0.46 0.46 0.43 0.41 0.4 0.46
Energía Cobrada (GWh) 0 0.43 0.37 0.41 0.39 0.45 0.41 0.42 0.41 0.37 0.4 0.43
% Servicio 98.85% 99.59% 100.00% 99.97% 99.03% 99.57% 99.65% 95.39% 98.51% 99.91% 98.20% 99.90%
% Sin Servicio 1.15% 0.41% 0.00% 0.03% 0.97% 0.43% 0.35% 4.61% 1.49% 0.09% 1.80% 0.10%
Interrupción Programada (Hrs) 11.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 0.00 0.00 6.00 0.00
Interrupción Ejecutada (Hrs) 8.28 2.98 0.00 0.20 7.10 3.12 2.54 33.64 10.88 0.68 13.15 0.76
Promedio Interrupción Diarias (Hrs) 0.27 0.10 0.00 0.01 0.23 0.10 0.08 1.11 0.36 0.02 0.43 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Tireo Arriba, Tireo al Medio, Tireo Abajo, El Café, Suriel, Portezuela, Tireo Abajo.