Circuito TIM204
Distribuidora EdeEste - Provincia Distrito Nacional
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 1037 | 1037 | 1029 | 1015 | 1005 | 986 | 987 | 990 | 994 | 983 | 1000 | 1007 |
| % Nivel Cobranza | 0.00% | 98.84% | 87.56% | 101.13% | 101.10% | 103.04% | 113.10% | 98.42% | 108.20% | 103.40% | 99.92% | 95.23% |
| % Nivel Pérdida | 0.00% | 13.34% | 6.72% | 10.31% | 9.86% | -17.24% | 4.93% | 8.38% | 10.94% | 4.64% | 6.91% | 12.29% |
| Energía Suministrada (GWh) | 0 | 1.87 | 1.73 | 1.46 | 1.49 | 1.11 | 1.44 | 1.75 | 1.60 | 1.71 | 1.84 | 1.98 |
| Energía Facturada (GWh) | 0 | 1.62 | 1.61 | 1.31 | 1.34 | 1.30 | 1.37 | 1.6 | 1.43 | 1.63 | 1.71 | 1.74 |
| Energía Cobrada (GWh) | 0 | 1.60 | 1.41 | 1.32 | 1.36 | 1.34 | 1.55 | 1.58 | 1.55 | 1.69 | 1.71 | 1.66 |
| % Servicio | 99.65% | 98.17% | 99.04% | 98.39% | 99.47% | 99.23% | 99.45% | 99.66% | 96.96% | 98.21% | 98.17% | 99.47% |
| % Sin Servicio | 0.35% | 1.83% | 0.96% | 1.61% | 0.53% | 0.77% | 0.55% | 0.34% | 3.04% | 1.79% | 1.83% | 0.53% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 6.00 | 3.00 | 0.00 | 0.00 | 6.00 | 0.00 | 12.00 | 0.00 | 4.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.55 | 13.18 | 6.93 | 11.60 | 3.85 | 5.57 | 3.97 | 2.57 | 22.20 | 13.08 | 13.37 | 3.83 |
| Promedio Interrupción Diarias (Hrs) | 0.08 | 0.43 | 0.23 | 0.38 | 0.13 | 0.18 | 0.13 | 0.08 | 0.73 | 0.43 | 0.44 | 0.13 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 12/08/2026 | Ejecutada | 19:08:00 | 19:12:00 | 0.07 | DISTRIBUCION (DISPARO/AVERIAS) - CABLE URD AVERIADO |
| 10/08/2026 | Programada | 09:20:00 | 15:20:00 | 6.00 | DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT |
| 10/08/2026 | Ejecutada | 10:46:00 | 13:55:00 | 3.15 | DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT |