Buscar Circuitos Glosario

Circuito TIM204

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1037 1037 1029 1015 1005 986 987 990 994 983 1000 1007
% Nivel Cobranza 0.00% 98.84% 87.56% 101.13% 101.10% 103.04% 113.10% 98.42% 108.20% 103.40% 99.92% 95.23%
% Nivel Pérdida 0.00% 13.34% 6.72% 10.31% 9.86% -17.24% 4.93% 8.38% 10.94% 4.64% 6.91% 12.29%
Energía Suministrada (GWh) 0 1.87 1.73 1.46 1.49 1.11 1.44 1.75 1.60 1.71 1.84 1.98
Energía Facturada (GWh) 0 1.62 1.61 1.31 1.34 1.30 1.37 1.6 1.43 1.63 1.71 1.74
Energía Cobrada (GWh) 0 1.60 1.41 1.32 1.36 1.34 1.55 1.58 1.55 1.69 1.71 1.66
% Servicio 99.65% 98.17% 99.04% 98.39% 99.47% 99.23% 99.45% 99.66% 96.96% 98.21% 98.17% 99.47%
% Sin Servicio 0.35% 1.83% 0.96% 1.61% 0.53% 0.77% 0.55% 0.34% 3.04% 1.79% 1.83% 0.53%
Interrupción Programada (Hrs) 0.00 0.00 6.00 3.00 0.00 0.00 6.00 0.00 12.00 0.00 4.00 0.00
Interrupción Ejecutada (Hrs) 2.55 13.18 6.93 11.60 3.85 5.57 3.97 2.57 22.20 13.08 13.37 3.83
Promedio Interrupción Diarias (Hrs) 0.08 0.43 0.23 0.38 0.13 0.18 0.13 0.08 0.73 0.43 0.44 0.13
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito TIM204
Interrupciones Programadas 6.00
Interrupciones Ejecutadas 3.22
% Ejecución Operativa 53.67%
Detalle de Salidas - Circuito TIM204
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
12/08/2026 Ejecutada 19:08:00 19:12:00 0.07 DISTRIBUCION (DISPARO/AVERIAS) - CABLE URD AVERIADO
10/08/2026 Programada 09:20:00 15:20:00 6.00 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
10/08/2026 Ejecutada 10:46:00 13:55:00 3.15 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
BOROJOL, MEJORAMIENTO SOCIAL, VILLA CONSUELO, VILLA FRANCISCA.