Buscar Circuitos Glosario

Circuito TIM203

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 3388 3385 3400 3400 3398 3429 3405 3368 3380 3390 3391 3421
% Nivel Cobranza 92.15% 92.58% 101.03% 95.99% 85.25% 84.57% 111.40% 104.02% 100.88% 108.75% 104.86% 103.52%
% Nivel Pérdida 42.57% 47.64% 48.98% 46.61% 46.39% 41.57% 45.72% 38.56% 39.85% 49.68% 52.50% 42.50%
Energía Suministrada (GWh) 1.68 1.77 1.72 1.59 1.54 1.28 1.21 1.09 1.22 1.44 1.60 1.48
Energía Facturada (GWh) 0.96 0.92 0.88 0.85 0.82 0.75 0.66 0.67 0.73 0.73 0.76 0.85
Energía Cobrada (GWh) 0.89 0.86 0.89 0.82 0.70 0.63 0.73 0.70 0.74 0.79 0.80 0.88
% Servicio 99.75% 99.79% 98.31% 98.30% 99.14% 98.12% 98.71% 99.08% 99.86% 98.96% 96.15% 96.89%
% Sin Servicio 0.25% 0.21% 1.69% 1.70% 0.86% 1.88% 1.29% 0.92% 0.14% 1.04% 3.85% 3.11%
Interrupción Programada (Hrs) 14.00 6.00 6.00 6.00 6.00 0.00 0.00 0.00 6.00 6.00 12.00 0.00
Interrupción Ejecutada (Hrs) 1.83 1.48 12.18 12.22 6.22 13.52 9.28 6.65 1.00 7.77 28.12 22.68
Promedio Interrupción Diarias (Hrs) 0.06 0.05 0.40 0.40 0.20 0.44 0.31 0.22 0.03 0.26 0.92 0.75
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito TIM203
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.07
% Ejecución Operativa 0%
Detalle de Salidas - Circuito TIM203
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
15/10/2026 Ejecutada 14:19:00 14:23:00 0.07 DISTRIBUCION (DISPARO/AVERIAS) - CABLE URD AVERIADO
BOROJOL, MEJORAMIENTO SOCIAL, VILLA FRANCISCA.