Buscar Circuitos Glosario

Circuito TIM203

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 3400 3400 3398 3429 3405 3368 3380 3390 3391 3421 3419 3587
% Nivel Cobranza 0.00% 95.99% 85.25% 84.57% 111.40% 104.02% 100.88% 108.75% 104.86% 103.52% 92.22% 94.60%
% Nivel Pérdida 0.00% 46.61% 46.39% 41.57% 45.72% 38.56% 39.85% 49.68% 52.50% 42.50% 48.05% 53.15%
Energía Suministrada (GWh) 0 1.59 1.54 1.28 1.21 1.09 1.22 1.44 1.60 1.48 1.7 1.78
Energía Facturada (GWh) 0 0.85 0.82 0.75 0.66 0.67 0.73 0.73 0.76 0.85 0.88 0.83
Energía Cobrada (GWh) 0 0.82 0.70 0.63 0.73 0.70 0.74 0.79 0.80 0.88 0.81 0.79
% Servicio 98.31% 98.30% 99.14% 98.12% 98.71% 99.08% 99.86% 98.96% 96.15% 96.89% 98.14% 98.67%
% Sin Servicio 1.69% 1.70% 0.86% 1.88% 1.29% 0.92% 0.14% 1.04% 3.85% 3.11% 1.86% 1.33%
Interrupción Programada (Hrs) 6.00 6.00 6.00 0.00 0.00 0.00 6.00 6.00 12.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 12.18 12.22 6.22 13.52 9.28 6.65 1.00 7.77 28.12 22.68 13.57 9.72
Promedio Interrupción Diarias (Hrs) 0.40 0.40 0.20 0.44 0.31 0.22 0.03 0.26 0.92 0.75 0.45 0.32
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito TIM203
Interrupciones Programadas 6.00
Interrupciones Ejecutadas 1.30
% Ejecución Operativa 21.67%
Detalle de Salidas - Circuito TIM203
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
12/08/2026 Ejecutada 19:13:00 19:20:00 0.12 DISTRIBUCION (DISPARO/AVERIAS) - CABLE URD AVERIADO
10/08/2026 Programada 09:20:00 15:20:00 6.00 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
10/08/2026 Ejecutada 09:46:00 10:57:00 1.18 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
BOROJOL, MEJORAMIENTO SOCIAL, VILLA FRANCISCA.