Circuito SROD102

Distribuidora EdeNorte - Provincia Santiago Rodriguez


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación A A A A A A A A A A A A
Clientes 10215 10187 7856 10119 10119 10118 10125 10120 10024 0 9985 9897
% Nivel Cobranza 90.31% 89.75% 98.32% 100.36% 0.37% 96.83% 91.40% 92.11% 93.61% 93.04% 95.31% 85.66%
% Nivel Pérdida 16.97% 8.05% 9.57% 13.82% -1.38% 10.31% 7.50% 16.13% 16.44% 13.44% 12.10% 11.65%
Energía Suministrada (GWh) 2.68 2.32 2.45 2.54 2.46 2.96 2.93 3.13 3.03 2.78 2.59 2.57
Energía Facturada (GWh) 2.22 2.13 2.21 2.19 2.5 2.66 2.71 2.63 2.53 2.4 2.28 2.27
Energía Cobrada (GWh) 2.01 1.91 2.17 2.2 0.01 2.57 2.48 2.42 2.37 2.24 2.17 1.95
% Servicio 99.58% 99.81% 99.86% 99.29% 98.61% 99.60% 98.75% 98.53% 98.32% 0.00% 98.79% 99.68%
% Sin Servicio 0.42% 0.19% 0.14% 0.71% 1.39% 0.40% 1.25% 1.47% 1.68% 0.00% 1.21% 0.32%
Interrupción Programada (Hrs) 0.00 0.00 0.00 5.00 3.00 5.00 0.00 5.00 5.00 0.00 5.00 0.00
Interrupción Ejecutada (Hrs) 3.08 1.40 1.04 5.18 10.12 2.95 9.15 10.72 12.28 0.00 8.81 2.31
Promedio Interrupción Diarias (Hrs) 0.10 0.05 0.03 0.17 0.33 0.10 0.30 0.35 0.40 0.00 0.29 0.08
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Las Caobas, Caimoní, Los Tabacos y Arroyo Seco, Centro del pueblo (Parcial 80%) Santiago Rodríguez (Parcial), Barrio El Tamarindo, Savica, El INVI, Mejoramiento Social, La Sabana, Urbanización Don Tilo, Mirador Sur, Los Tomines, El Caimito, Los Cajules, El Guanal, Pata de Vaca, La Sabana, Canbelén. Villa Polin, El Millon, Mata del Jobo, La Castilla.