Circuito SROD102

Distribuidora EdeNorte - Provincia Santiago Rodriguez


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación A A A A A A A A A A A A
Clientes 10421 10421 10396 10359 10333 10293 10276 10249 10215 10187 7856 10119
% Nivel Cobranza 0.00% 96.16% 95.69% 86.13% 97.81% 78.50% 93.11% 91.69% 90.31% 89.75% 98.32% 100.36%
% Nivel Pérdida 0.00% 7.03% 6.79% 7.91% 16.10% 10.09% 17.53% 5.04% 16.97% 8.05% 9.57% 13.82%
Energía Suministrada (GWh) 0 2.83 2.92 3.11 3.21 3 2.83 2.49 2.68 2.32 2.45 2.54
Energía Facturada (GWh) 0 2.63 2.72 2.86 2.7 2.69 2.34 2.36 2.22 2.13 2.21 2.19
Energía Cobrada (GWh) 0 2.53 2.6 2.47 2.64 2.11 2.18 2.17 2.01 1.91 2.17 2.2
% Servicio 97.99% 98.88% 98.85% 96.95% 97.61% 99.61% 99.63% 99.91% 99.58% 99.81% 99.86% 99.29%
% Sin Servicio 2.01% 1.12% 1.15% 3.05% 2.39% 0.39% 0.37% 0.09% 0.42% 0.19% 0.14% 0.71%
Interrupción Programada (Hrs) 5.00 0.00 5.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00
Interrupción Ejecutada (Hrs) 14.69 8.14 8.38 22.26 17.47 2.86 2.69 0.64 3.08 1.40 1.04 5.18
Promedio Interrupción Diarias (Hrs) 0.48 0.27 0.28 0.73 0.57 0.09 0.09 0.02 0.10 0.05 0.03 0.17
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Las Caobas, Caimoní, Los Tabacos y Arroyo Seco, Centro del pueblo (Parcial 80%) Santiago Rodríguez (Parcial), Barrio El Tamarindo, Savica, El INVI, Mejoramiento Social, La Sabana, Urbanización Don Tilo, Mirador Sur, Los Tomines, El Caimito, Los Cajules, El Guanal, Pata de Vaca, La Sabana, Canbelén. Villa Polin, El Millon, Mata del Jobo, La Castilla.