Buscar Circuitos Glosario

Circuito SPM104

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 3671 3646 3638 3638 3653 3657 3670 4688 4683 4685 4691 4679
% Nivel Cobranza 99.33% 88.31% 95.45% 91.36% 88.80% 89.79% 113.79% 99.79% 104.73% 104.80% 96.68% 103.64%
% Nivel Pérdida 49.18% 48.37% 52.25% 49.87% 52.96% 45.97% 54.54% 42.28% 49.20% 49.19% 49.22% -60.63%
Energía Suministrada (GWh) 3.4 3.43 3.49 3.27 3.14 2.58 2.80 2.65 3.10 3.38 3.47 1.10
Energía Facturada (GWh) 1.73 1.77 1.66 1.64 1.48 1.39 1.27 1.53 1.58 1.72 1.76 1.76
Energía Cobrada (GWh) 1.72 1.56 1.59 1.50 1.31 1.25 1.45 1.53 1.65 1.80 1.70 1.83
% Servicio 98.92% 96.87% 97.54% 98.22% 99.72% 98.13% 98.26% 96.55% 99.28% 99.53% 98.31% 96.28%
% Sin Servicio 1.08% 3.13% 2.46% 1.78% 0.28% 1.87% 1.74% 3.45% 0.72% 0.47% 1.69% 3.72%
Interrupción Programada (Hrs) 7.00 25.00 12.00 0.00 0.00 5.00 12.00 13.00 0.00 0.00 0.00 8.00
Interrupción Ejecutada (Hrs) 7.77 22.57 17.68 12.82 2.03 13.47 12.53 24.82 5.15 3.53 12.35 27.17
Promedio Interrupción Diarias (Hrs) 0.26 0.74 0.58 0.42 0.07 0.44 0.41 0.82 0.17 0.12 0.41 0.89
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SPM104
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.13
% Ejecución Operativa 0%
Detalle de Salidas - Circuito SPM104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/10/2026 Ejecutada 18:43:00 18:51:00 0.13 DISTRIBUCION (DISPARO/AVERIAS) - FALLOS EN FUSIBLE
BARRIO ENRIQUILLO, CENTRO DE LA CIUDAD, JAPÓN, LAS FLORES, LAS PIEDRAS, LOS MAESTROS, MIRAMAR, PEDRO JUSTO CARRIÓN III, PEDRO JUSTO CORRION I, PLACER BONITO, VILLA MUNICIPAL, VILLA VELÁSQUEZ, BARRIO SANTA CLARA, VILLA FARO, SAN ANTON, HAZIM.