Circuito SOSU105

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 100.00% 100.00% 100.00% 199.39% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
% Nivel Pérdida 0.00% 3.49% -3.23% 10.83% -10.82% -0.46% 4.67% -6.47% 4.35% 3.26% -3.26% 5.59%
Energía Suministrada (GWh) 0 0.39 0.38 0.38 0.36 0.39 0.41 0.38 0.41 0.39 0.37 0.37
Energía Facturada (GWh) 0 0.38 0.39 0.34 0.4 0.39 0.39 0.4 0.39 0.37 0.38 0.35
Energía Cobrada (GWh) 0 0.38 0.39 0.34 0.79 0.39 0.39 0.4 0.39 0.37 0.38 0.35
% Servicio 98.79% 99.17% 99.27% 99.06% 98.42% 98.87% 99.77% 98.13% 99.79% 99.86% 99.48% 98.86%
% Sin Servicio 1.21% 0.83% 0.73% 0.94% 1.58% 1.13% 0.23% 1.87% 0.21% 0.14% 0.52% 1.14%
Interrupción Programada (Hrs) 0.00 5.00 0.00 6.00 0.00 4.00 1.00 8.00 0.00 2.00 0.00 8.00
Interrupción Ejecutada (Hrs) 8.68 5.96 5.25 6.75 11.39 8.13 1.70 13.68 1.54 1.02 3.83 8.34
Promedio Interrupción Diarias (Hrs) 0.29 0.20 0.17 0.22 0.37 0.27 0.06 0.45 0.05 0.03 0.13 0.27
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SOSU105
Interrupciones Programadas 0
Interrupciones Ejecutadas 4.60
% Ejecución Operativa 0%
Detalle de Salidas - Circuito SOSU105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 16:28:02 16:44:17 0.52 APERTURA DE LINEA DE TRANSMISION
08/07/2026 Ejecutada 09:58:05 10:13:01 0.52 APERTURA DE LINEA DE TRANSMISION
04/07/2026 Ejecutada 16:49:13 17:04:09 1.78 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 09:12:45 10:44:21 1.78 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION