Buscar Circuitos Glosario

Circuito SOSU104

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 4126 4126 4118 4102 4117 4101 4100 4094 4092 4087 4077 4063
% Nivel Cobranza 0.00% 104.60% 80.01% 130.01% 100.88% 98.62% 115.57% 98.95% 102.16% 103.04% 103.91% 78.64%
% Nivel Pérdida 0.00% 13.90% 6.04% 20.26% -4.14% 8.12% 11.70% 2.57% 8.22% 6.56% 8.84% 18.89%
Energía Suministrada (GWh) 0 2.78 2.55 2.58 2.21 2.57 2.61 2.65 2.81 2.83 3.04 3.09
Energía Facturada (GWh) 0 2.39 2.4 2.06 2.3 2.36 2.3 2.58 2.58 2.64 2.77 2.51
Energía Cobrada (GWh) 0 2.5 1.92 2.68 2.32 2.33 2.66 2.55 2.63 2.72 2.88 1.97
% Servicio 98.66% 98.98% 99.05% 98.10% 97.12% 98.67% 99.62% 97.80% 98.80% 99.59% 98.12% 98.46%
% Sin Servicio 1.34% 1.03% 0.95% 1.90% 2.88% 1.33% 0.38% 2.20% 1.20% 0.41% 1.88% 1.54%
Interrupción Programada (Hrs) 0.00 5.00 0.00 10.00 0.00 4.00 1.00 12.00 5.00 2.00 0.00 8.00
Interrupción Ejecutada (Hrs) 9.63 7.38 6.81 13.69 20.77 9.60 2.83 16.04 8.77 2.99 13.75 11.21
Promedio Interrupción Diarias (Hrs) 0.32 0.24 0.22 0.45 0.68 0.32 0.09 0.53 0.29 0.10 0.45 0.37
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SOSU104
Interrupciones Programadas 4
Interrupciones Ejecutadas 19.92
% Ejecución Operativa 498.00%
Detalle de Salidas - Circuito SOSU104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 16:27:55 16:45:28 0.63 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 12:31:29 12:36:59 0.63 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 09:58:16 10:12:50 0.63 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
07/07/2026 Ejecutada 07:34:03 07:43:45 0.16 ACTUACION BAJA FRECUENCIA (81)
05/07/2026 Ejecutada 22:57:46 23:03:48 0.1 ACTUACION BAJA FRECUENCIA (81)
04/07/2026 Programada 08:00:00 12:00:00 4 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 16:47:23 16:59:50 8.74 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:11:58 15:43:43 8.74 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
03/07/2026 Ejecutada 12:50:21 12:53:38 0.06 DISPARO DESCONOCIDO
02/07/2026 Ejecutada 15:24:04 15:35:06 0.18 FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
01/07/2026 Ejecutada 10:45:22 10:48:28 0.05 DISPARO DESCONOCIDO
Casa Marina Reef, Infinity Blue, El Batey, Playa Chiquita, Urbanización Erica, La Explanada, Sosúa Bay Resort, Villas Ana María, Ayuntamiento Sosua, Cuartel AMET - PN, Supermercado Playero.