Circuito SJUA103B

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 2735 2735 2725 2722 2721 2703 2688 2688 2679 2657 2669 2638
% Nivel Cobranza 0.00% 94.05% 77.79% 94.56% 89.20% 91.54% 96.70% 93.43% 96.85% 100.98% 87.57% 97.83%
% Nivel Pérdida 0.00% 28.65% 17.89% 38.93% 24.49% 31.29% 26.25% 28.67% 27.34% 30.91% 31.92% 34.32%
Energía Suministrada (GWh) 0 0.65 0.64 0.77 0.58 0.67 0.69 0.67 0.68 0.7 0.77 0.73
Energía Facturada (GWh) 0 0.46 0.52 0.47 0.44 0.46 0.51 0.48 0.50 0.48 0.53 0.48
Energía Cobrada (GWh) 0 0.44 0.41 0.45 0.39 0.42 0.49 0.45 0.48 0.49 0.46 0.47
% Servicio 97.53% 99.01% 99.01% 97.85% 98.86% 98.00% 97.89% 97.55% 98.18% 98.15% 97.71% 98.29%
% Sin Servicio 2.47% 0.99% 0.99% 2.15% 1.14% 2.00% 2.11% 2.45% 1.82% 1.85% 2.29% 1.71%
Interrupción Programada (Hrs) 8.00 12.00 12.00 6.00 0.00 0.00 3.00 8.00 3.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 17.77 7.10 7.10 15.48 8.19 14.37 15.67 17.88 13.26 13.50 16.69 12.47
Promedio Interrupción Diarias (Hrs) 0.58 0.23 0.23 0.51 0.27 0.47 0.52 0.59 0.44 0.44 0.55 0.41
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SJUA103B
Interrupciones Programadas 0
Interrupciones Ejecutadas 5.08
% Ejecución Operativa 0%
Detalle de Salidas - Circuito SJUA103B
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
01/07/2026 Ejecutada 17:33:38 20:01:00 2.46 FALLA DE COMUNICACION //
25/06/2026 Ejecutada 15:28:17 16:53:17 1.42 INSTALAR TRANSFORMADOR MT/BT //
24/06/2026 Ejecutada 14:25:27 14:52:18 0.60 FALLA TRANSITORIA // FALLA TRANSITORIA //
24/06/2026 Ejecutada 13:32:57 13:42:20 0.60 FALLA TRANSITORIA // FALLA TRANSITORIA //
Hacia Pedro Corto