Circuito SJUA103A

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C D C C C C C D C C D C
Clientes 14 14 13 17 16 12 14 14 26 26 26 26
% Nivel Cobranza 0.00% 90.13% 85.90% 125.47% 123.50% 113.57% 71.77% 73.26% 193.00% 66.78% 99.77% 90.67%
% Nivel Pérdida 0.00% 93.01% 94.22% 94.04% 94.68% 93.80% 93.68% 94.39% 95.33% 91.41% 92.16% 90.20%
Energía Suministrada (GWh) 0 0.06 0.06 0.05 0.06 0.05 0.05 0.06 0.05 0.05 0.06 0.06
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0.01
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0.01
% Servicio 100.00% 100.00% 100.00% 99.25% 98.75% 99.11% 100.00% 99.87% 99.99% 99.86% 100.00% 99.91%
% Sin Servicio 0.00% 0.00% 0.00% 0.75% 1.25% 0.89% 0.00% 0.13% 0.01% 0.14% 0.00% 0.09%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.02 5.45 9.10 6.48 0.00 0.95 0.08 1.04 0.00 0.66
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.18 0.30 0.21 0.00 0.03 0.00 0.03 0.00 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. Mesopotamia