Circuito SJUA103A

Distribuidora EdeSur - Provincia San Juan


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C C D C C D C C C C C
Clientes 16 12 14 14 26 26 26 26 26 28 29 28
% Nivel Cobranza 123.50% 113.57% 71.77% 73.26% 193.00% 66.78% 99.77% 90.67% 55.89% 55.43% 128.72% 76.43%
% Nivel Pérdida 94.68% 93.80% 93.68% 94.39% 95.33% 91.41% 92.16% 90.20% 88.58% 87.08% 89.19% 91.20%
Energía Suministrada (GWh) 0.06 0.05 0.05 0.06 0.05 0.05 0.06 0.06 0.06 0.06 0.05 0.05
Energía Facturada (GWh) 0 0 0 0 0 0 0 0.01 0.01 0.01 0.01 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0.01 0 0 0.01 0
% Servicio 98.75% 99.11% 100.00% 99.87% 99.99% 99.86% 100.00% 99.91% 99.99% 100.00% 100.00% 99.91%
% Sin Servicio 1.25% 0.89% 0.00% 0.13% 0.01% 0.14% 0.00% 0.09% 0.01% 0.00% 0.00% 0.09%
Interrupción Programada (Hrs) 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 9.10 6.48 0.00 0.95 0.08 1.04 0.00 0.66 0.04 0.00 0.00 0.64
Promedio Interrupción Diarias (Hrs) 0.30 0.21 0.00 0.03 0.00 0.03 0.00 0.02 0.00 0.00 0.00 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. Mesopotamia