Buscar Circuitos Glosario

Circuito SJUA101E

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 1370 1370 325 1361 1353 316 318 318 1328 1319 1328 1319
% Nivel Cobranza 0.00% 88.68% 97.56% 110.74% 71.46% 86.64% 120.20% 85.77% 91.40% 90.19% 94.62% 106.19%
% Nivel Pérdida 0.00% 40.70% 60.81% 46.15% 22.19% 62.19% 47.74% 61.15% 40.33% 48.69% 50.99% 42.73%
Energía Suministrada (GWh) 0 0.50 0.49 0.59 0.51 0.48 0.52 0.48 0.55 0.64 0.65 0.53
Energía Facturada (GWh) 0 0.30 0.19 0.32 0.40 0.18 0.27 0.19 0.33 0.33 0.32 0.31
Energía Cobrada (GWh) 0 0.26 0.19 0.35 0.28 0.16 0.32 0.16 0.30 0.3 0.3 0.32
% Servicio 99.63% 99.34% 99.34% 100.00% 99.45% 99.53% 99.96% 99.08% 99.03% 98.34% 98.26% 99.48%
% Sin Servicio 0.37% 0.66% 0.66% 0.00% 0.55% 0.47% 0.04% 0.92% 0.97% 1.66% 1.74% 0.52%
Interrupción Programada (Hrs) 0.00 2.00 2.00 8.00 5.00 0.00 3.00 3.00 3.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.66 4.74 4.74 0.02 3.97 3.38 0.29 6.71 7.10 12.10 12.72 3.80
Promedio Interrupción Diarias (Hrs) 0.09 0.16 0.16 0.00 0.13 0.11 0.01 0.22 0.23 0.40 0.42 0.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SJUA101E
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.05
% Ejecución Operativa 0%
Detalle de Salidas - Circuito SJUA101E
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
13/06/2026 Ejecutada 16:14:39 18:12:00 1.96 FACILITAR TRABAJOS ETED //
09/06/2026 Ejecutada 15:04:48 15:10:17 0.09 FALLA TRANSITORIA //
Carr francisco Sanchez