Circuito SJOC402B

Distribuidora EdeSur - Provincia San José De Ocoa


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C C C C C C D C
Clientes 3234 3234 3231 3210 3196 3184 3185 3177 3160 3158 3150 3473
% Nivel Cobranza 0.00% 101.21% 95.68% 94.30% 100.82% 91.48% 102.32% 112.23% 98.15% 98.84% 87.61% 104.86%
% Nivel Pérdida 0.00% -10.87% -1.19% 11.40% 11.91% 2.08% -0.13% 12.99% 14.88% -1.96% -2.45% 65.35%
Energía Suministrada (GWh) 0 0.45 0.51 0.57 0.55 0.48 0.43 0.44 0.5 0.4 0.46 1.27
Energía Facturada (GWh) 0 0.50 0.51 0.5 0.48 0.47 0.44 0.38 0.43 0.41 0.47 0.44
Energía Cobrada (GWh) 0 0.51 0.49 0.48 0.49 0.43 0.45 0.43 0.42 0.4 0.41 0.46
% Servicio 98.35% 97.29% 98.90% 99.50% 97.89% 98.50% 99.39% 100.00% 99.89% 100.00% 99.61% 99.76%
% Sin Servicio 1.65% 2.71% 1.10% 0.50% 2.11% 1.50% 0.61% 0.00% 0.11% 0.00% 0.39% 0.24%
Interrupción Programada (Hrs) 10.00 12.00 4.00 2.00 10.00 10.00 2.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 12.07 19.79 8.00 3.66 15.43 10.96 4.44 0.00 0.78 0.03 2.84 1.77
Promedio Interrupción Diarias (Hrs) 0.40 0.65 0.26 0.12 0.51 0.36 0.15 0.00 0.03 0.00 0.09 0.06
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

La Ciénaga de San José de Ocoa.