Circuito SJOC402

Distribuidora EdeSur - Provincia San José De Ocoa


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C C C C C C B C
Clientes 2047 2047 2048 2044 2036 2024 2018 2007 1993 1987 2006 1996
% Nivel Cobranza 0.00% 95.72% 85.01% 89.76% 91.00% 91.82% 91.69% 84.57% 96.62% 91.77% 87.48% 97.79%
% Nivel Pérdida 0.00% 43.81% 44.20% 48.17% 53.73% 48.40% 60.63% 39.49% 53.69% 41.48% 56.47% -57.11%
Energía Suministrada (GWh) 0 0.66 0.68 0.77 0.75 0.67 0.85 0.57 0.63 0.51 0.75 0.19
Energía Facturada (GWh) 0 0.37 0.38 0.4 0.35 0.35 0.34 0.34 0.29 0.3 0.33 0.3
Energía Cobrada (GWh) 0 0.35 0.32 0.36 0.31 0.32 0.31 0.29 0.28 0.27 0.29 0.3
% Servicio 97.53% 97.68% 96.68% 96.85% 98.72% 98.28% 98.04% 99.32% 97.79% 95.40% 90.79% 96.86%
% Sin Servicio 2.47% 2.32% 3.32% 3.15% 1.28% 1.72% 1.96% 0.68% 2.21% 4.60% 9.21% 3.14%
Interrupción Programada (Hrs) 11.00 13.00 19.00 8.00 9.00 12.00 15.00 8.00 9.00 25.00 48.00 16.00
Interrupción Ejecutada (Hrs) 18.02 16.97 24.22 23.01 9.34 12.57 14.30 4.98 16.14 33.61 67.21 22.94
Promedio Interrupción Diarias (Hrs) 0.59 0.56 0.80 0.76 0.31 0.41 0.47 0.16 0.53 1.11 2.21 0.75
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Pueblo de Ocoa (Parcial), Las Flores, La Ciénaga, Panca, Sabana Larga, El Naranjal, Las Malaguetas, Los Arroyos, Los Almendros, La Horma.