Circuito SCNO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación D D B C B B C B B B B B
Clientes 1661 1650 1640 1589 1602 1595 4486 4493 4362 4448 4544 4556
% Nivel Cobranza 89.26% 91.61% 79.71% 96.60% 93.02% 110.80% 83.62% 85.87% 88.13% 91.76% 90.48% 86.28%
% Nivel Pérdida 74.38% 68.35% 52.25% 61.93% 86.45% 89.63% 74.56% 76.28% 75.80% 74.85% 73.52% 70.48%
Energía Suministrada (GWh) 1.82 1.49 1.06 1.18 3.55 4.6 4.47 4.7 4.33 4.16 4.12 3.72
Energía Facturada (GWh) 0.47 0.47 0.51 0.45 0.48 0.48 1.14 1.12 1.05 1.05 1.09 1.1
Energía Cobrada (GWh) 0.42 0.43 0.4 0.44 0.45 0.53 0.95 0.96 0.92 0.96 0.99 0.95
% Servicio 98.08% 96.63% 91.43% 98.98% 97.17% 95.26% 93.68% 97.09% 96.83% 97.29% 97.87% 98.13%
% Sin Servicio 1.92% 3.37% 8.57% 1.02% 2.83% 4.74% 6.32% 2.91% 3.17% 2.71% 2.13% 1.87%
Interrupción Programada (Hrs) 6.00 18.00 40.00 0.00 5.00 9.00 15.00 5.00 6.00 3.00 0.00 12.00
Interrupción Ejecutada (Hrs) 14.05 24.63 62.57 7.45 20.66 34.60 46.13 21.24 23.16 19.77 15.57 13.65
Promedio Interrupción Diarias (Hrs) 0.46 0.81 2.06 0.24 0.68 1.14 1.52 0.70 0.76 0.65 0.51 0.45
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Adonis, Urb. 6 de Noviembre, Aut. 6 de Noviembre (parcial), KM 5, Cambita Pueblecito, Cambita Esterlin, Cambita Uribe, Villa Liberación, Cambita, Cambita Sterling, Cambita Garabito, Santana. Cambita pueblecito, Calderón, KM 4 de Cambita, Urb. Yamilé III, Loma Verde, El Fondo, Urraca, Los Toros, La Guama, Los Talibanes, Cumía Abajo, Bo. 15 de Agosto, El Cajón, Noa, Andrade Gutiérrez, Loma de los Osvaldo, INVI, Hospital de Cambita, Bo. San Francisco, Industrias Banilejas, Mucha Agua, Bo. La Torre, Los Cacaos, Paseo de las Flores, Las Antenas, Loma del Picacho, Los Fersanes, Najayo Arriba, La Colonia.