Circuito SCNO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación D D D D D D D D D C C D
Clientes 2277 2277 2258 2241 2241 1741 1726 1712 1719 1703 1689 1656
% Nivel Cobranza 0.00% 86.02% 87.20% 81.14% 99.06% 89.00% 85.65% 83.35% 92.94% 81.23% 91.62% 85.33%
% Nivel Pérdida 0.00% 55.04% 57.01% 58.68% 61.51% 72.51% 73.21% 76.02% 76.03% 73.17% 74.46% 70.99%
Energía Suministrada (GWh) 0 1.54 1.68 1.77 1.81 2.05 2.17 2.26 2.2 1.98 1.94 1.73
Energía Facturada (GWh) 0 0.69 0.72 0.73 0.70 0.56 0.58 0.54 0.53 0.53 0.5 0.5
Energía Cobrada (GWh) 0 0.60 0.63 0.59 0.69 0.50 0.5 0.45 0.49 0.43 0.45 0.43
% Servicio 97.63% 97.89% 97.14% 98.37% 98.23% 96.88% 96.13% 94.34% 96.40% 98.10% 97.36% 98.02%
% Sin Servicio 2.37% 2.11% 2.86% 1.63% 1.77% 3.12% 3.87% 5.66% 3.60% 1.90% 2.64% 1.98%
Interrupción Programada (Hrs) 9.00 3.00 6.00 8.00 3.00 0.00 3.00 3.00 6.00 6.00 10.00 17.00
Interrupción Ejecutada (Hrs) 17.05 15.22 20.60 12.11 12.94 22.75 28.22 41.29 26.30 13.88 19.24 14.43
Promedio Interrupción Diarias (Hrs) 0.56 0.50 0.68 0.40 0.43 0.75 0.93 1.36 0.86 0.46 0.63 0.47
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Adonis, Urb. 6 de Noviembre, Aut. 6 de Noviembre (parcial), KM 5, Cambita Pueblecito, Cambita Esterlin, Cambita Uribe, Villa Liberación, Cambita, Cambita Sterling, Cambita Garabito, Santana. Cambita pueblecito, Calderón, KM 4 de Cambita, Urb. Yamilé III, Loma Verde, El Fondo, Urraca, Los Toros, La Guama, Los Talibanes, Cumía Abajo, Bo. 15 de Agosto, El Cajón, Noa, Andrade Gutiérrez, Loma de los Osvaldo, INVI, Hospital de Cambita, Bo. San Francisco, Industrias Banilejas, Mucha Agua, Bo. La Torre, Los Cacaos, Paseo de las Flores, Las Antenas, Loma del Picacho, Los Fersanes, Najayo Arriba, La Colonia.