Circuito SCNO102

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación D D B C B B C B B B B B
Clientes 7973 7833 7836 7799 7884 7882 7835 7804 6074 6077 6052 5980
% Nivel Cobranza 98.08% 88.62% 103.07% 98.10% 95.57% 93.05% 89.59% 82.21% 92.57% 89.35% 87.65% 86.97%
% Nivel Pérdida 62.32% 56.38% 59.29% 62.90% 59.20% 63.62% 63.29% 61.25% 65.47% 64.19% 62.09% 59.00%
Energía Suministrada (GWh) 3.53 2.83 3.13 3.45 3.26 4.35 4.22 4.34 4.15 3.94 3.84 3.32
Energía Facturada (GWh) 1.33 1.23 1.27 1.28 1.33 1.58 1.55 1.68 1.43 1.41 1.46 1.36
Energía Cobrada (GWh) 1.31 1.09 1.31 1.26 1.27 1.47 1.39 1.38 1.33 1.26 1.28 1.18
% Servicio 97.02% 96.18% 91.69% 98.62% 98.51% 97.90% 97.63% 97.15% 96.57% 97.88% 98.22% 98.69%
% Sin Servicio 2.98% 3.82% 8.31% 1.38% 1.49% 2.10% 2.37% 2.85% 3.43% 2.12% 1.78% 1.31%
Interrupción Programada (Hrs) 3.00 21.00 40.00 3.00 0.00 0.00 3.00 2.00 9.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 21.75 27.89 60.63 10.10 10.91 15.29 17.33 20.83 25.02 15.45 12.98 9.57
Promedio Interrupción Diarias (Hrs) 0.72 0.92 1.99 0.33 0.36 0.50 0.57 0.68 0.82 0.51 0.43 0.31
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.