Circuito SCNO102
Distribuidora EdeSur - Provincia San Cristóbal
| Mes-Año | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | C | C | D | D | D | B | C | B | B |
| Clientes | 8207 | 8207 | 8192 | 8143 | 8060 | 8017 | 7973 | 7833 | 7836 | 7799 | 7884 | 7882 |
| % Nivel Cobranza | 0.00% | 93.03% | 87.77% | 88.89% | 90.16% | 91.27% | 98.08% | 88.62% | 103.07% | 98.10% | 95.57% | 93.05% |
| % Nivel Pérdida | 0.00% | 62.82% | 62.47% | 59.23% | 64.80% | 59.05% | 62.32% | 56.38% | 59.29% | 62.90% | 59.20% | 63.62% |
| Energía Suministrada (GWh) | 0 | 4.53 | 4.27 | 3.89 | 3.9 | 3.43 | 3.53 | 2.83 | 3.13 | 3.45 | 3.26 | 4.35 |
| Energía Facturada (GWh) | 0 | 1.68 | 1.6 | 1.58 | 1.37 | 1.4 | 1.33 | 1.23 | 1.27 | 1.28 | 1.33 | 1.58 |
| Energía Cobrada (GWh) | 0 | 1.57 | 1.41 | 1.41 | 1.24 | 1.28 | 1.31 | 1.09 | 1.31 | 1.26 | 1.27 | 1.47 |
| % Servicio | 94.57% | 95.48% | 98.05% | 98.93% | 98.27% | 98.52% | 97.02% | 96.18% | 91.69% | 98.62% | 98.51% | 97.90% |
| % Sin Servicio | 5.43% | 4.52% | 1.95% | 1.07% | 1.73% | 1.48% | 2.98% | 3.82% | 8.31% | 1.38% | 1.49% | 2.10% |
| Interrupción Programada (Hrs) | 7.00 | 4.00 | 3.00 | 3.00 | 3.00 | 0.00 | 3.00 | 21.00 | 40.00 | 3.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 39.64 | 32.96 | 14.26 | 7.83 | 12.63 | 10.78 | 21.75 | 27.89 | 60.63 | 10.10 | 10.91 | 15.29 |
| Promedio Interrupción Diarias (Hrs) | 1.30 | 1.08 | 0.47 | 0.26 | 0.42 | 0.35 | 0.72 | 0.92 | 1.99 | 0.33 | 0.36 | 0.50 |
Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.