Circuito SCNO102
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | D | B | C | B | B | C | B | B | B | B | B |
Clientes | 7973 | 7833 | 7836 | 7799 | 7884 | 7882 | 7835 | 7804 | 6074 | 6077 | 6052 | 5980 |
% Nivel Cobranza | 98.08% | 88.62% | 103.07% | 98.10% | 95.57% | 93.05% | 89.59% | 82.21% | 92.57% | 89.35% | 87.65% | 86.97% |
% Nivel Pérdida | 62.32% | 56.38% | 59.29% | 62.90% | 59.20% | 63.62% | 63.29% | 61.25% | 65.47% | 64.19% | 62.09% | 59.00% |
Energía Suministrada (GWh) | 3.53 | 2.83 | 3.13 | 3.45 | 3.26 | 4.35 | 4.22 | 4.34 | 4.15 | 3.94 | 3.84 | 3.32 |
Energía Facturada (GWh) | 1.33 | 1.23 | 1.27 | 1.28 | 1.33 | 1.58 | 1.55 | 1.68 | 1.43 | 1.41 | 1.46 | 1.36 |
Energía Cobrada (GWh) | 1.31 | 1.09 | 1.31 | 1.26 | 1.27 | 1.47 | 1.39 | 1.38 | 1.33 | 1.26 | 1.28 | 1.18 |
% Servicio | 97.02% | 96.18% | 91.69% | 98.62% | 98.51% | 97.90% | 97.63% | 97.15% | 96.57% | 97.88% | 98.22% | 98.69% |
% Sin Servicio | 2.98% | 3.82% | 8.31% | 1.38% | 1.49% | 2.10% | 2.37% | 2.85% | 3.43% | 2.12% | 1.78% | 1.31% |
Interrupción Programada (Hrs) | 3.00 | 21.00 | 40.00 | 3.00 | 0.00 | 0.00 | 3.00 | 2.00 | 9.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 21.75 | 27.89 | 60.63 | 10.10 | 10.91 | 15.29 | 17.33 | 20.83 | 25.02 | 15.45 | 12.98 | 9.57 |
Promedio Interrupción Diarias (Hrs) | 0.72 | 0.92 | 1.99 | 0.33 | 0.36 | 0.50 | 0.57 | 0.68 | 0.82 | 0.51 | 0.43 | 0.31 |
Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.