Circuito SCNO102

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación D C C D D D B C B B C B
Clientes 8143 8143 8060 8017 7973 7833 7836 7799 7884 7882 7835 7804
% Nivel Cobranza 0.00% 88.89% 90.16% 91.27% 98.08% 88.62% 103.07% 98.10% 95.57% 93.05% 89.59% 82.21%
% Nivel Pérdida 0.00% 59.23% 64.80% 59.05% 62.32% 56.38% 59.29% 62.90% 59.20% 63.62% 63.29% 61.25%
Energía Suministrada (GWh) 0 3.89 3.9 3.43 3.53 2.83 3.13 3.45 3.26 4.35 4.22 4.34
Energía Facturada (GWh) 0 1.58 1.37 1.4 1.33 1.23 1.27 1.28 1.33 1.58 1.55 1.68
Energía Cobrada (GWh) 0 1.41 1.24 1.28 1.31 1.09 1.31 1.26 1.27 1.47 1.39 1.38
% Servicio 98.05% 98.93% 98.27% 98.52% 97.02% 96.18% 91.69% 98.62% 98.51% 97.90% 97.63% 97.15%
% Sin Servicio 1.95% 1.07% 1.73% 1.48% 2.98% 3.82% 8.31% 1.38% 1.49% 2.10% 2.37% 2.85%
Interrupción Programada (Hrs) 3.00 3.00 3.00 0.00 3.00 21.00 40.00 3.00 0.00 0.00 3.00 2.00
Interrupción Ejecutada (Hrs) 14.26 7.83 12.63 10.78 21.75 27.89 60.63 10.10 10.91 15.29 17.33 20.83
Promedio Interrupción Diarias (Hrs) 0.47 0.26 0.42 0.35 0.72 0.92 1.99 0.33 0.36 0.50 0.57 0.68
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.