Circuito SCNO102

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación D D D C C D D D B C B B
Clientes 8207 8207 8192 8143 8060 8017 7973 7833 7836 7799 7884 7882
% Nivel Cobranza 0.00% 93.03% 87.77% 88.89% 90.16% 91.27% 98.08% 88.62% 103.07% 98.10% 95.57% 93.05%
% Nivel Pérdida 0.00% 62.82% 62.47% 59.23% 64.80% 59.05% 62.32% 56.38% 59.29% 62.90% 59.20% 63.62%
Energía Suministrada (GWh) 0 4.53 4.27 3.89 3.9 3.43 3.53 2.83 3.13 3.45 3.26 4.35
Energía Facturada (GWh) 0 1.68 1.6 1.58 1.37 1.4 1.33 1.23 1.27 1.28 1.33 1.58
Energía Cobrada (GWh) 0 1.57 1.41 1.41 1.24 1.28 1.31 1.09 1.31 1.26 1.27 1.47
% Servicio 94.57% 95.48% 98.05% 98.93% 98.27% 98.52% 97.02% 96.18% 91.69% 98.62% 98.51% 97.90%
% Sin Servicio 5.43% 4.52% 1.95% 1.07% 1.73% 1.48% 2.98% 3.82% 8.31% 1.38% 1.49% 2.10%
Interrupción Programada (Hrs) 7.00 4.00 3.00 3.00 3.00 0.00 3.00 21.00 40.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 39.64 32.96 14.26 7.83 12.63 10.78 21.75 27.89 60.63 10.10 10.91 15.29
Promedio Interrupción Diarias (Hrs) 1.30 1.08 0.47 0.26 0.42 0.35 0.72 0.92 1.99 0.33 0.36 0.50
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.