Circuito SCNO102

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D C C D D D B C
Clientes 8248 8248 8196 8207 8192 8143 8060 8017 7973 7833 7836 7799
% Nivel Cobranza 0.00% 100.52% 87.12% 93.03% 87.77% 88.89% 90.16% 91.27% 98.08% 88.62% 103.07% 98.10%
% Nivel Pérdida 0.00% 59.18% 58.22% 62.82% 62.47% 59.23% 64.80% 59.05% 62.32% 56.38% 59.29% 62.90%
Energía Suministrada (GWh) 0 3.99 4.23 4.53 4.27 3.89 3.9 3.43 3.53 2.83 3.13 3.45
Energía Facturada (GWh) 0 1.63 1.77 1.68 1.6 1.58 1.37 1.4 1.33 1.23 1.27 1.28
Energía Cobrada (GWh) 0 1.64 1.54 1.57 1.41 1.41 1.24 1.28 1.31 1.09 1.31 1.26
% Servicio 98.00% 96.48% 94.57% 95.48% 98.05% 98.93% 98.27% 98.52% 97.02% 96.18% 91.69% 98.62%
% Sin Servicio 2.00% 3.52% 5.43% 4.52% 1.95% 1.07% 1.73% 1.48% 2.98% 3.82% 8.31% 1.38%
Interrupción Programada (Hrs) 4.00 0.00 7.00 4.00 3.00 3.00 3.00 0.00 3.00 21.00 40.00 3.00
Interrupción Ejecutada (Hrs) 14.59 25.71 39.64 32.96 14.26 7.83 12.63 10.78 21.75 27.89 60.63 10.10
Promedio Interrupción Diarias (Hrs) 0.48 0.85 1.30 1.08 0.47 0.26 0.42 0.35 0.72 0.92 1.99 0.33
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.