Circuito SCNO102

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación D D D D D D D C C D D D
Clientes 8245 8230 8230 8248 8196 8207 8192 8143 8060 8017 7973 7833
% Nivel Cobranza 0.00% 0.00% 103.76% 100.52% 87.12% 93.03% 87.77% 88.89% 90.16% 91.27% 98.08% 88.62%
% Nivel Pérdida 0.00% 0.00% 59.25% 59.18% 58.22% 62.82% 62.47% 59.23% 64.80% 59.05% 62.32% 56.38%
Energía Suministrada (GWh) 0 0 3.51 3.99 4.23 4.53 4.27 3.89 3.9 3.43 3.53 2.83
Energía Facturada (GWh) 0 0 1.43 1.63 1.77 1.68 1.6 1.58 1.37 1.4 1.33 1.23
Energía Cobrada (GWh) 0 0 1.48 1.64 1.54 1.57 1.41 1.41 1.24 1.28 1.31 1.09
% Servicio 99.05% 98.06% 98.00% 96.48% 94.57% 95.48% 98.05% 98.93% 98.27% 98.52% 97.02% 96.18%
% Sin Servicio 0.95% 1.94% 2.00% 3.52% 5.43% 4.52% 1.95% 1.07% 1.73% 1.48% 2.98% 3.82%
Interrupción Programada (Hrs) 3.00 4.00 4.00 0.00 7.00 4.00 3.00 3.00 3.00 0.00 3.00 21.00
Interrupción Ejecutada (Hrs) 6.85 14.41 14.59 25.71 39.64 32.96 14.26 7.83 12.63 10.78 21.75 27.89
Promedio Interrupción Diarias (Hrs) 0.23 0.47 0.48 0.85 1.30 1.08 0.47 0.26 0.42 0.35 0.72 0.92
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Urb. Vidaliana, Urb. Shalom, Urb. Gran Jinete, La Guandulera, 5 de Abril, Los Molinas, Villa Fundación, Calle Bonita, San Francisco, El Ramón.