Circuito SCNO101A

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación D C C D D D A C A A C A
Clientes 2215 2215 2136 2137 2138 2132 2137 2127 2133 2123 2104 2108
% Nivel Cobranza 0.00% 43.44% 47.59% 49.74% 45.34% 46.44% 47.97% 43.38% 51.75% 45.40% 40.78% 39.87%
% Nivel Pérdida 0.00% 87.44% 86.54% 86.20% 86.95% 84.67% 85.16% 86.51% 86.04% 84.73% 85.28% 85.53%
Energía Suministrada (GWh) 0 2.73 2.53 2.47 2.59 2.11 2.3 2.45 2.36 2.18 2.24 2.35
Energía Facturada (GWh) 0 0.34 0.34 0.34 0.34 0.32 0.34 0.33 0.33 0.33 0.33 0.34
Energía Cobrada (GWh) 0 0.15 0.16 0.17 0.15 0.15 0.16 0.14 0.17 0.15 0.13 0.14
% Servicio 96.15% 93.96% 95.95% 96.25% 97.79% 98.33% 98.04% 96.86% 98.23% 97.61% 94.96% 96.44%
% Sin Servicio 3.85% 6.04% 4.05% 3.75% 2.21% 1.67% 1.96% 3.14% 1.77% 2.39% 5.04% 3.56%
Interrupción Programada (Hrs) 15.00 16.00 16.00 6.00 9.00 10.00 7.00 0.00 6.00 3.00 3.00 3.00
Interrupción Ejecutada (Hrs) 28.10 44.11 29.57 27.36 16.14 12.17 14.29 22.89 12.93 17.45 36.76 25.99
Promedio Interrupción Diarias (Hrs) 0.92 1.45 0.97 0.90 0.53 0.40 0.47 0.75 0.43 0.57 1.21 0.85
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El pomier, Los Cacaítos, Santa Maria, Boruga, Limón Dulce, Pica Pica, Los Montones, Hato Dama, Medina, La Cuchilla