Circuito SCNO101A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | C | C | D | D | D | A | C | A | A | C | A |
Clientes | 2215 | 2215 | 2136 | 2137 | 2138 | 2132 | 2137 | 2127 | 2133 | 2123 | 2104 | 2108 |
% Nivel Cobranza | 0.00% | 43.44% | 47.59% | 49.74% | 45.34% | 46.44% | 47.97% | 43.38% | 51.75% | 45.40% | 40.78% | 39.87% |
% Nivel Pérdida | 0.00% | 87.44% | 86.54% | 86.20% | 86.95% | 84.67% | 85.16% | 86.51% | 86.04% | 84.73% | 85.28% | 85.53% |
Energía Suministrada (GWh) | 0 | 2.73 | 2.53 | 2.47 | 2.59 | 2.11 | 2.3 | 2.45 | 2.36 | 2.18 | 2.24 | 2.35 |
Energía Facturada (GWh) | 0 | 0.34 | 0.34 | 0.34 | 0.34 | 0.32 | 0.34 | 0.33 | 0.33 | 0.33 | 0.33 | 0.34 |
Energía Cobrada (GWh) | 0 | 0.15 | 0.16 | 0.17 | 0.15 | 0.15 | 0.16 | 0.14 | 0.17 | 0.15 | 0.13 | 0.14 |
% Servicio | 96.15% | 93.96% | 95.95% | 96.25% | 97.79% | 98.33% | 98.04% | 96.86% | 98.23% | 97.61% | 94.96% | 96.44% |
% Sin Servicio | 3.85% | 6.04% | 4.05% | 3.75% | 2.21% | 1.67% | 1.96% | 3.14% | 1.77% | 2.39% | 5.04% | 3.56% |
Interrupción Programada (Hrs) | 15.00 | 16.00 | 16.00 | 6.00 | 9.00 | 10.00 | 7.00 | 0.00 | 6.00 | 3.00 | 3.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 28.10 | 44.11 | 29.57 | 27.36 | 16.14 | 12.17 | 14.29 | 22.89 | 12.93 | 17.45 | 36.76 | 25.99 |
Promedio Interrupción Diarias (Hrs) | 0.92 | 1.45 | 0.97 | 0.90 | 0.53 | 0.40 | 0.47 | 0.75 | 0.43 | 0.57 | 1.21 | 0.85 |
El pomier, Los Cacaítos, Santa Maria, Boruga, Limón Dulce, Pica Pica, Los Montones, Hato Dama, Medina, La Cuchilla