Buscar Circuitos Glosario

Circuito SANC105

Distribuidora EdeNorte - Provincia Samana


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 284 284 1331 1331 1333 1334 275 272 271 269 269 268
% Nivel Cobranza 0.00% 96.38% 96.66% 86.57% 100.57% 84.01% 104.77% 98.66% 100.73% 103.28% 99.45% 101.10%
% Nivel Pérdida 0.00% 23.90% 65.71% 65.05% 69.22% 60.83% 65.11% 10.12% 26.23% 28.63% 17.66% 18.65%
Energía Suministrada (GWh) 0 0.4 0.89 1.38 1.29 1.1 0.63 0.28 0.32 0.34 0.27 0.32
Energía Facturada (GWh) 0 0.31 0.3 0.48 0.4 0.43 0.22 0.25 0.24 0.24 0.22 0.26
Energía Cobrada (GWh) 0 0.3 0.29 0.42 0.4 0.36 0.23 0.25 0.24 0.25 0.22 0.26
% Servicio 98.78% 99.27% 98.45% 98.79% 99.78% 99.77% 98.71% 97.49% 99.92% 99.99% 97.32% 99.02%
% Sin Servicio 1.22% 0.73% 1.55% 1.21% 0.22% 0.23% 1.29% 2.51% 0.08% 0.01% 2.68% 0.98%
Interrupción Programada (Hrs) 6.00 0.00 4.00 6.00 0.00 0.00 6.00 6.00 0.00 0.00 4.00 0.00
Interrupción Ejecutada (Hrs) 8.77 5.23 11.17 8.71 1.62 1.67 9.26 18.04 0.55 0.05 19.56 7.18
Promedio Interrupción Diarias (Hrs) 0.29 0.17 0.37 0.29 0.05 0.05 0.30 0.59 0.02 0.00 0.64 0.24
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SANC105
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.82
% Ejecución Operativa 0%
Detalle de Salidas - Circuito SANC105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
02/10/2026 Ejecutada 22:56:32 23:15:37 0.32 FALLAS ETED, DISPARO DE LINEA TRANSMISION
25/09/2026 Ejecutada 13:37:21 13:40:22 0.75 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO
25/09/2026 Ejecutada 09:47:49 10:29:36 0.75 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO
Los Agregados Sánchez y Santa Bárbara (UNR).