Buscar Circuitos Glosario

Circuito SANC102

Distribuidora EdeNorte - Provincia Samana


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 8 8 8 8 8 8 8 8 8 8 8 8
% Nivel Cobranza 0.00% 100.03% 141.95% 178.64% 103.70% 7.75% 100.08% 100.83% 146.88% 108.16% 53.12% 92.83%
% Nivel Pérdida 0.00% 42.65% 36.27% 45.72% 2.67% 23.54% 28.25% 20.44% 22.88% 9.99% 26.53% 27.38%
Energía Suministrada (GWh) 0 0.13 0.13 0.14 0.11 0.14 0.14 0.12 0.12 0.12 0.14 0.13
Energía Facturada (GWh) 0 0.08 0.08 0.07 0.11 0.11 0.1 0.1 0.09 0.11 0.1 0.09
Energía Cobrada (GWh) 0 0.08 0.12 0.13 0.11 0.01 0.1 0.1 0.14 0.12 0.05 0.09
% Servicio 97.93% 98.68% 99.93% 99.19% 96.75% 99.87% 99.94% 97.97% 99.55% 99.79% 99.32% 99.29%
% Sin Servicio 2.07% 1.32% 0.07% 0.81% 3.25% 0.13% 0.06% 2.03% 0.45% 0.21% 0.68% 0.71%
Interrupción Programada (Hrs) 16.00 15.00 10.00 6.00 6.00 0.00 0.00 4.00 0.00 4.00 5.00 5.00
Interrupción Ejecutada (Hrs) 14.87 9.47 0.50 5.83 23.42 0.93 0.42 14.85 3.27 1.51 4.94 5.21
Promedio Interrupción Diarias (Hrs) 0.49 0.31 0.02 0.19 0.77 0.03 0.01 0.49 0.11 0.05 0.16 0.17
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SANC102
Interrupciones Programadas 10
Interrupciones Ejecutadas 15.55
% Ejecución Operativa 155.50%
Detalle de Salidas - Circuito SANC102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 15:09:42 18:33:00 3.72 ARBOLES Y RAMA SOBRE LINEA
08/07/2026 Ejecutada 14:49:31 15:09:35 3.72 ARBOLES Y RAMA SOBRE LINEA
03/07/2026 Programada 12:00:00 17:00:00 5 DESARROLLO DE OBRAS
03/07/2026 Ejecutada 12:17:17 15:57:19 3.67 DESARROLLO DE OBRAS
02/07/2026 Ejecutada 16:41:34 16:47:33 0.1 DISPARO DESCONOCIDO
01/07/2026 Programada 12:00:00 17:00:00 5 DESARROLLO DE OBRAS
01/07/2026 Ejecutada 12:34:39 16:55:03 4.34 DESARROLLO DE OBRAS
Aeropuerto del Catey y Block & Hormigones Peninsular S. A.