Buscar Circuitos Glosario

Circuito SAMA102

Distribuidora EdeNorte - Provincia Samana


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 6512 6512 6325 6325 6361 6308 6265 6259 6288 6259 6239 6231
% Nivel Cobranza 0.00% 80.04% 100.87% 80.61% 88.15% 96.85% 110.56% 92.03% 92.52% 104.48% 96.10% 103.37%
% Nivel Pérdida 0.00% 44.02% 45.32% 32.07% 44.60% 35.47% 40.42% 23.54% 32.76% 35.98% 33.50% 38.76%
Energía Suministrada (GWh) 0 4.64 4.6 4.46 4.44 3.72 3.65 3.1 3.6 3.64 3.73 4.23
Energía Facturada (GWh) 0 2.6 2.51 3.03 2.46 2.4 2.18 2.37 2.42 2.33 2.48 2.59
Energía Cobrada (GWh) 0 2.08 2.54 2.44 2.17 2.33 2.41 2.18 2.24 2.44 2.39 2.68
% Servicio 99.84% 98.01% 97.73% 98.50% 98.06% 99.51% 99.87% 96.37% 99.76% 99.37% 98.24% 98.72%
% Sin Servicio 0.16% 1.99% 2.27% 1.50% 1.94% 0.49% 0.13% 3.63% 0.24% 0.63% 1.76% 1.28%
Interrupción Programada (Hrs) 0.00 6.00 4.00 6.00 10.00 0.00 0.00 11.00 6.00 5.00 0.00 4.00
Interrupción Ejecutada (Hrs) 1.17 14.31 16.34 10.82 14.00 3.54 0.96 26.11 1.71 4.70 12.86 9.35
Promedio Interrupción Diarias (Hrs) 0.04 0.47 0.54 0.36 0.46 0.12 0.03 0.86 0.06 0.15 0.42 0.31
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SAMA102
Interrupciones Programadas 6
Interrupciones Ejecutadas 8.92
% Ejecución Operativa 148.67%
Detalle de Salidas - Circuito SAMA102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Programada 10:00:00 16:00:00 6 INTERCONEXION DE PROYECTOS
20/10/2026 Ejecutada 15:59:13 16:07:25 4.42 INTERCONEXION DE PROYECTOS
20/10/2026 Ejecutada 11:42:00 15:59:13 4.42 INTERCONEXION DE PROYECTOS
17/10/2026 Ejecutada 11:01:28 11:06:29 0.08 DISPARO DESCONOCIDO
Centro Pueblo Samaná, La Mezcla, Cacavelly, Villas Salma, Barrio Willmore, Barrio El Play, El Limon, El Play (Parcial), Ríos. El Progreso el Limon