Circuito SALC104PAL
Distribuidora EdeNorte - Provincia Hermanas Mirabal
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 1168 | 1168 | 1158 | 1158 | 1158 | 1158 | 1158 | 1158 | 1158 | 1158 | 1158 | 1158 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 97.14% | 95.39% | 96.15% | 96.01% | 98.97% | 99.95% | 98.48% | 99.37% | 97.07% | 97.18% | 98.42% | 98.35% |
| % Sin Servicio | 2.86% | 4.61% | 3.85% | 3.99% | 1.03% | 0.05% | 1.52% | 0.63% | 2.93% | 2.82% | 1.58% | 1.65% |
| Interrupción Programada (Hrs) | 21.00 | 28.00 | 23.00 | 24.00 | 6.00 | 6.00 | 5.00 | 0.00 | 6.00 | 5.00 | 11.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 20.56 | 33.17 | 27.71 | 28.76 | 7.45 | 0.39 | 10.96 | 4.71 | 21.39 | 20.62 | 11.51 | 12.01 |
| Promedio Interrupción Diarias (Hrs) | 0.68 | 1.09 | 0.91 | 0.95 | 0.24 | 0.01 | 0.36 | 0.15 | 0.70 | 0.68 | 0.38 | 0.39 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/08/2026 | Programada | 10:00:00 | 15:00:00 | 5 | PREVENTIVO EN CONDUCTOR DE FASE |
| 20/08/2026 | Ejecutada | 14:52:33 | 14:56:35 | 0.24 | PREVENTIVO EN CONDUCTOR DE FASE |
| 20/08/2026 | Ejecutada | 10:04:34 | 10:14:44 | 0.24 | PREVENTIVO EN CONDUCTOR DE FASE |
| 18/08/2026 | Ejecutada | 13:56:54 | 14:01:47 | 0.08 | DISPARO DESCONOCIDO |
| 17/08/2026 | Ejecutada | 17:36:08 | 18:21:39 | 0.91 | POSTE ROTO |
| 17/08/2026 | Ejecutada | 17:32:31 | 17:36:07 | 0.91 | POSTE ROTO |
| 17/08/2026 | Ejecutada | 17:27:20 | 17:32:29 | 0.91 | POSTE ROTO |
| 16/08/2026 | Ejecutada | 18:39:58 | 18:45:51 | 0.2 | CORRECTIVO EN CONDUCTOR DE FASE |
| 16/08/2026 | Ejecutada | 17:35:57 | 17:42:10 | 0.2 | CORRECTIVO EN CONDUCTOR DE FASE |