Circuito SALC104MAD

Distribuidora EdeNorte - Provincia Hermanas Mirabal


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación D D D D D D D D D D D D
Clientes 1246 1246 1233 1212 1205 1173 1177 1131 1129 1139 1138 1130
% Nivel Cobranza 0.00% 76.57% 87.91% 76.57% 110.80% 84.74% 80.86% 96.82% 82.06% 97.10% 90.89% 90.92%
% Nivel Pérdida 0.00% 54.36% 58.04% 54.87% 62.45% 52.94% 59.33% 66.92% 64.91% 66.85% 66.20% 67.98%
Energía Suministrada (GWh) 0 0.48 0.47 0.42 0.43 0.37 0.45 0.48 0.48 0.51 0.54 0.55
Energía Facturada (GWh) 0 0.22 0.2 0.19 0.16 0.17 0.18 0.16 0.17 0.17 0.18 0.18
Energía Cobrada (GWh) 0 0.17 0.17 0.14 0.18 0.15 0.15 0.16 0.14 0.16 0.17 0.16
% Servicio 95.38% 93.13% 94.52% 93.88% 98.54% 92.72% 99.06% 99.88% 97.12% 96.07% 97.09% 94.45%
% Sin Servicio 4.62% 6.87% 5.48% 6.12% 1.46% 7.28% 0.94% 0.12% 2.88% 3.93% 2.91% 5.55%
Interrupción Programada (Hrs) 66.00 66.00 53.00 40.00 18.00 66.00 17.00 0.00 6.00 5.00 0.00 24.00
Interrupción Ejecutada (Hrs) 33.27 49.46 39.43 44.03 10.53 52.42 6.80 0.92 21.01 28.68 21.22 40.53
Promedio Interrupción Diarias (Hrs) 1.09 1.63 1.30 1.45 0.35 1.72 0.22 0.03 0.69 0.94 0.70 1.33
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SALC104MAD
Interrupciones Programadas 15
Interrupciones Ejecutadas 11.97
% Ejecución Operativa 79.80%
Detalle de Salidas - Circuito SALC104MAD
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 10:00:00 15:00:00 5 PREVENTIVO EN CONDUCTOR DE FASE
20/08/2026 Ejecutada 14:52:33 14:56:35 0.24 PREVENTIVO EN CONDUCTOR DE FASE
20/08/2026 Ejecutada 10:04:34 10:14:44 0.24 PREVENTIVO EN CONDUCTOR DE FASE
18/08/2026 Programada 08:00:00 13:00:00 5 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
18/08/2026 Ejecutada 15:23:24 16:12:37 0.9 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
18/08/2026 Ejecutada 13:56:54 14:01:47 0.9 CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
17/08/2026 Ejecutada 23:24:23 23:33:30 1.76 CAUSA DESCONOCIDA // POSTE ROTO // PUENTE ROTO
17/08/2026 Ejecutada 18:32:36 19:14:44 1.76 CAUSA DESCONOCIDA // POSTE ROTO // PUENTE ROTO
17/08/2026 Ejecutada 17:36:08 18:21:39 1.76 CAUSA DESCONOCIDA // POSTE ROTO // PUENTE ROTO
17/08/2026 Ejecutada 17:32:31 17:36:07 1.76 CAUSA DESCONOCIDA // POSTE ROTO // PUENTE ROTO
17/08/2026 Ejecutada 17:27:20 17:32:29 1.76 CAUSA DESCONOCIDA // POSTE ROTO // PUENTE ROTO
16/08/2026 Ejecutada 18:39:58 18:45:51 0.26 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
16/08/2026 Ejecutada 17:35:57 17:42:10 0.26 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
16/08/2026 Ejecutada 12:25:08 12:28:41 0.26 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
15/08/2026 Ejecutada 19:33:54 19:40:28 0.11 CORRECTIVO EN FUSIBLE
14/08/2026 Programada 09:00:00 14:00:00 5
Montellano, Monte Adentro, La Bellaca, Las Cumbres, El Jobo, Los Azules.