Circuito SALC104
Distribuidora EdeNorte - Provincia Hermanas Mirabal
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 8012 | 8012 | 7989 | 7983 | 7979 | 7998 | 7974 | 7938 | 7937 | 7937 | 7930 | 7913 |
| % Nivel Cobranza | 0.00% | 84.55% | 90.19% | 82.94% | 110.12% | 95.20% | 94.95% | 108.39% | 93.71% | 100.58% | 84.18% | 85.96% |
| % Nivel Pérdida | 0.00% | 32.47% | 34.94% | 25.63% | 32.11% | 14.76% | 21.51% | 28.03% | 21.79% | 23.40% | 20.26% | 32.06% |
| Energía Suministrada (GWh) | 0 | 3.26 | 2.91 | 2.43 | 2.32 | 2.09 | 2.4 | 2.64 | 2.68 | 3.03 | 3.28 | 3.4 |
| Energía Facturada (GWh) | 0 | 2.2 | 1.89 | 1.81 | 1.58 | 1.78 | 1.88 | 1.9 | 2.09 | 2.32 | 2.61 | 2.31 |
| Energía Cobrada (GWh) | 0 | 1.86 | 1.71 | 1.5 | 1.74 | 1.7 | 1.79 | 2.06 | 1.96 | 2.33 | 2.2 | 1.99 |
| % Servicio | 98.87% | 98.69% | 99.93% | 99.28% | 99.16% | 99.95% | 99.37% | 99.92% | 97.68% | 98.55% | 99.24% | 99.15% |
| % Sin Servicio | 1.13% | 1.31% | 0.07% | 0.72% | 0.84% | 0.05% | 0.63% | 0.08% | 2.32% | 1.45% | 0.76% | 0.85% |
| Interrupción Programada (Hrs) | 5.00 | 6.00 | 6.00 | 6.00 | 6.00 | 6.00 | 5.00 | 0.00 | 6.00 | 5.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 8.11 | 9.40 | 0.51 | 5.21 | 6.07 | 0.33 | 4.55 | 0.58 | 16.91 | 10.60 | 5.55 | 6.21 |
| Promedio Interrupción Diarias (Hrs) | 0.27 | 0.31 | 0.02 | 0.17 | 0.20 | 0.01 | 0.15 | 0.02 | 0.56 | 0.35 | 0.18 | 0.20 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/08/2026 | Ejecutada | 14:52:33 | 14:56:35 | 0.24 | PREVENTIVO EN CONDUCTOR DE FASE |
| 20/08/2026 | Ejecutada | 10:04:34 | 10:14:44 | 0.24 | PREVENTIVO EN CONDUCTOR DE FASE |
| 18/08/2026 | Ejecutada | 13:56:54 | 14:01:47 | 0.08 | DISPARO DESCONOCIDO |
| 17/08/2026 | Ejecutada | 17:36:08 | 18:21:39 | 0.91 | POSTE ROTO |
| 17/08/2026 | Ejecutada | 17:32:31 | 17:36:07 | 0.91 | POSTE ROTO |
| 17/08/2026 | Ejecutada | 17:27:20 | 17:32:29 | 0.91 | POSTE ROTO |
| 16/08/2026 | Ejecutada | 18:39:58 | 18:45:51 | 0.2 | CORRECTIVO EN CONDUCTOR DE FASE |
| 16/08/2026 | Ejecutada | 17:35:57 | 17:42:10 | 0.2 | CORRECTIVO EN CONDUCTOR DE FASE |