| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 |
|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B |
| Clientes | 438 | 438 | 438 | 438 | 438 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 99.63% | 99.26% | 99.38% | 97.41% | 99.85% |
| % Sin Servicio | 0.37% | 0.74% | 0.62% | 2.59% | 0.15% |
| Interrupción Programada (Hrs) | 65.00 | 65.00 | 50.00 | 43.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.64 | 5.34 | 4.48 | 18.67 | 1.11 |
| Promedio Interrupción Diarias (Hrs) | 0.09 | 0.18 | 0.15 | 0.61 | 0.04 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/08/2026 | Programada | 08:00:00 | 13:00:00 | 5 | OTROS |
| 20/08/2026 | Ejecutada | 08:26:37 | 12:52:44 | 4.44 | OTROS |
| 18/08/2026 | Programada | 09:00:00 | 14:00:00 | 5 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 18/08/2026 | Ejecutada | 05:40:25 | 09:18:11 | 3.63 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 14/08/2026 | Programada | 10:00:00 | 15:00:00 | 5 | |
| 13/08/2026 | Ejecutada | 07:27:00 | 07:32:09 | 0.09 | DISPARO DESCONOCIDO |