Circuito SABY101GAL

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 588 588 590 588 584 589 587 585 587 585 590 595
% Nivel Cobranza 0.00% 83.42% 85.01% 98.56% 73.16% 83.13% 93.11% 74.19% 86.64% 93.37% 98.98% 88.48%
% Nivel Pérdida 0.00% 75.51% 71.45% 74.04% 67.65% 73.10% 75.39% 72.34% 63.83% 64.68% 65.73% 68.50%
Energía Suministrada (GWh) 0 0.4 0.35 0.34 0.3 0.36 0.37 0.36 0.25 0.26 0.27 0.27
Energía Facturada (GWh) 0 0.1 0.1 0.09 0.1 0.1 0.09 0.1 0.09 0.09 0.09 0.08
Energía Cobrada (GWh) 0 0.08 0.08 0.09 0.07 0.08 0.09 0.07 0.08 0.09 0.09 0.07
% Servicio 90.75% 91.45% 92.25% 95.91% 93.17% 97.18% 95.58% 96.35% 94.45% 96.09% 91.04% 96.21%
% Sin Servicio 9.25% 8.55% 7.75% 4.09% 6.83% 2.82% 4.42% 3.65% 5.55% 3.91% 8.96% 3.79%
Interrupción Programada (Hrs) 61.00 57.00 44.00 24.00 17.00 4.00 11.00 21.00 14.00 11.00 23.00 11.00
Interrupción Ejecutada (Hrs) 66.60 61.57 55.81 29.48 49.21 20.33 32.89 26.61 40.53 28.54 65.40 27.64
Promedio Interrupción Diarias (Hrs) 2.19 2.02 1.83 0.97 1.62 0.67 1.08 0.87 1.33 0.94 2.15 0.91
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito SABY101GAL
Interrupciones Programadas 20
Interrupciones Ejecutadas 27.68
% Ejecución Operativa 138.40%
Detalle de Salidas - Circuito SABY101GAL
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 12:00:00 17:00:00 5 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 17:50:11 17:57:01 0.88 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 16:28:21 16:44:08 0.88 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 14:10:43 14:18:47 0.88 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 13:50:17 13:58:43 0.88 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 09:58:58 10:12:24 0.88 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO
07/07/2026 Ejecutada 13:32:55 13:36:42 0.06 DISPARO DESCONOCIDO
06/07/2026 Programada 11:00:00 16:00:00 5
04/07/2026 Programada 08:00:00 12:00:00 4 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 16:49:28 17:04:06 8.73 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:12:32 15:41:55 8.73 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
03/07/2026 Programada 11:00:00 17:00:00 6 PREVENTIVO EN POSTE
03/07/2026 Ejecutada 10:27:48 16:13:19 5.76 PREVENTIVO EN POSTE
Blanco Arriba, Piragua Y La Peñita.