Circuito RINC102PIN

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jun26 Nov16 Oct16 Sep16 Ago16 Jul16 Jun16 May16 Abr16 Mar16 Feb16 Ene16
Clasificación D D D D D D D D D D D D
Clientes 1 1223 1089 1072 997 997 990 991 1008 982 977 985
% Nivel Cobranza 0.00% 89.49% 101.73% 92.74% 99.30% 105.24% 87.90% 99.90% 93.47% 102.38% 98.44% 82.63%
% Nivel Pérdida 0.00% 57.69% 64.45% 68.33% 70.14% 66.02% 57.21% 69.42% 60.32% 62.34% 62.41% 58.01%
Energía Suministrada (GWh) 0 0.37 4.19 0.46 0.42 0.38 0.35 0.41 0.31 0.32 0.33 0.32
Energía Facturada (GWh) 0 0.16 1.49 0.15 0.12 0.13 0.15 0.12 0.12 0.12 0.13 0.13
Energía Cobrada (GWh) 0 0.14 1.52 0.14 0.12 0.14 0.13 0.12 0.12 0.13 0.12 0.11
% Servicio 99.90% 63.12% 63.69% 63.93% 63.94% 55.95% 56.90% 68.32% 51.32% 51.63% 56.46% 55.70%
% Sin Servicio 0.10% 36.88% 36.31% 36.07% 36.06% 44.05% 43.10% 31.68% 48.68% 48.37% 43.54% 44.30%
Interrupción Programada (Hrs) 0.00 348.00 361.00 345.00 309.00 312.00 306.00 259.00 345.00 358.00 315.00 325.00
Interrupción Ejecutada (Hrs) 0.71 269.20 265.05 263.29 263.25 321.56 314.62 231.24 355.39 353.13 317.86 323.36
Promedio Interrupción Diarias (Hrs) 0.02 8.85 8.71 8.66 8.65 10.57 10.34 7.60 11.68 11.61 10.45 10.63
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RINC102PIN
Interrupciones Programadas 6
Interrupciones Ejecutadas 1.37
% Ejecución Operativa 22.83%
Detalle de Salidas - Circuito RINC102PIN
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 14:35:32 14:44:43 0.15 PERDIDA DE TENSION DE LA 12.5
03/07/2026 Programada 09:00:00 15:00:00 6
02/07/2026 Ejecutada 15:38:50 16:04:31 0.61 CORRECTIVO EN CONDUCTOR DE FASE
02/07/2026 Ejecutada 15:28:14 15:38:50 0.61 CORRECTIVO EN CONDUCTOR DE FASE
El Pino, Controba (parcial) Loma Miranda, Acapulco, La Piedra.