Buscar Circuitos Glosario

Circuito RINC102

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 3902 3902 3909 3840 3839 3892 3871 3880 3869 3866 3775 3730
% Nivel Cobranza 0.00% 82.21% 94.77% 80.29% 132.23% 96.89% 99.35% 102.58% 101.31% 113.69% 110.01% 82.80%
% Nivel Pérdida 0.00% 11.78% 16.36% 25.20% 37.93% 9.71% 19.66% 13.03% 21.58% 26.58% 17.52% 21.52%
Energía Suministrada (GWh) 0 1.99 2.14 2.03 1.84 1.42 1.63 1.7 1.9 2 1.85 2.07
Energía Facturada (GWh) 0 1.76 1.79 1.52 1.14 1.29 1.31 1.48 1.49 1.47 1.53 1.63
Energía Cobrada (GWh) 0 1.44 1.69 1.22 1.51 1.25 1.3 1.52 1.51 1.67 1.68 1.35
% Servicio 98.14% 98.14% 98.71% 97.63% 98.46% 96.82% 98.39% 97.72% 97.92% 98.75% 96.37% 96.36%
% Sin Servicio 1.86% 1.86% 1.29% 2.37% 1.54% 3.18% 1.61% 2.28% 2.08% 1.25% 3.63% 3.64%
Interrupción Programada (Hrs) 6.00 6.00 1.00 0.00 4.00 7.00 6.00 10.00 0.00 2.00 4.00 4.00
Interrupción Ejecutada (Hrs) 13.37 13.42 9.27 17.05 11.08 22.93 11.56 16.94 15.20 9.16 26.48 26.58
Promedio Interrupción Diarias (Hrs) 0.44 0.44 0.30 0.56 0.36 0.75 0.38 0.56 0.50 0.30 0.87 0.87
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RINC102
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.69
% Ejecución Operativa 0%
Detalle de Salidas - Circuito RINC102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/08/2026 Ejecutada 23:30:24 23:40:25 0.17 DISPARO DESCONOCIDO
12/08/2026 Ejecutada 03:06:55 03:34:45 0.84 DISPARO DESCONOCIDO
12/08/2026 Ejecutada 02:46:56 03:03:29 0.84 DISPARO DESCONOCIDO
12/08/2026 Ejecutada 00:35:29 00:41:30 0.84 DISPARO DESCONOCIDO
Junumucú, Controba, Tranvas, Rincón (parcial), Procesadora de Arroz Ramona Gómez, Pollo Vegano, Controba (parcial), Los Haitises, Almonte Agroindustrial, Coopagro, Factoria Miranda, Texaco Parador El Pino, Proyecto Granjas Romano.