Buscar Circuitos Glosario

Circuito RCL123

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 1816 1323 1323 1323 1323 1323 1323 1323 1323 1323 1323 1500
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 58.05% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 96.08% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 5.94 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0.23 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0.14 0
% Servicio 99.48% 99.78% 99.44% 99.70% 98.34% 99.99% 99.94% 96.90% 98.67% 98.98% 99.46% 98.63%
% Sin Servicio 0.52% 0.22% 0.56% 0.30% 1.66% 0.01% 0.06% 3.10% 1.33% 1.02% 0.54% 1.37%
Interrupción Programada (Hrs) 29.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 17.00 0.00 24.00
Interrupción Ejecutada (Hrs) 3.73 1.55 4.05 2.17 11.92 0.10 0.43 22.60 9.72 7.42 3.95 10.03
Promedio Interrupción Diarias (Hrs) 0.12 0.05 0.13 0.07 0.39 0.00 0.01 0.74 0.32 0.24 0.13 0.33
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RCL123
Interrupciones Programadas 6.00
Interrupciones Ejecutadas 0.15
% Ejecución Operativa 2.50%
Detalle de Salidas - Circuito RCL123
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Programada 09:20:00 15:20:00 6.00
04/07/2026 Ejecutada 02:21:00 02:30:00 0.15 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
BARRIO NUEVO, URB PRIMAVERAL.