| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 168 | 168 | 166 | 166 | 169 | 155 | 148 | 147 | 139 | 139 | 139 | 140 |
| % Nivel Cobranza | 0.00% | 108.71% | 93.32% | 91.92% | 97.20% | 91.32% | 96.48% | 108.76% | 112.85% | 112.29% | 94.37% | 90.39% |
| % Nivel Pérdida | 0.00% | -28.79% | -45.02% | -47.15% | -53.70% | -48.34% | 60.65% | 63.27% | 46.96% | 22.88% | 23.61% | 35.69% |
| Energía Suministrada (GWh) | 0 | 0.11 | 0.10 | 0.10 | 0.09 | 0.09 | 0.34 | 0.34 | 0.26 | 0.19 | 0.23 | 0.26 |
| Energía Facturada (GWh) | 0 | 0.14 | 0.15 | 0.15 | 0.14 | 0.13 | 0.14 | 0.13 | 0.14 | 0.15 | 0.17 | 0.17 |
| Energía Cobrada (GWh) | 0 | 0.15 | 0.14 | 0.14 | 0.14 | 0.12 | 0.13 | 0.14 | 0.15 | 0.17 | 0.16 | 0.15 |
| % Servicio | 99.43% | 98.07% | 98.02% | 97.83% | 99.14% | 96.87% | 98.90% | 99.04% | 99.35% | 96.67% | 98.37% | 98.36% |
| % Sin Servicio | 0.57% | 1.93% | 1.98% | 2.17% | 0.86% | 3.13% | 1.10% | 0.96% | 0.65% | 3.33% | 1.63% | 1.64% |
| Interrupción Programada (Hrs) | 56.00 | 54.00 | 12.00 | 12.00 | 6.00 | 6.00 | 16.00 | 9.00 | 12.00 | 10.00 | 6.00 | 6.00 |
| Interrupción Ejecutada (Hrs) | 4.13 | 13.90 | 14.28 | 15.63 | 6.17 | 22.55 | 7.90 | 7.13 | 4.77 | 24.32 | 11.93 | 11.95 |
| Promedio Interrupción Diarias (Hrs) | 0.14 | 0.46 | 0.47 | 0.51 | 0.20 | 0.74 | 0.26 | 0.23 | 0.16 | 0.80 | 0.39 | 0.39 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 19/08/2026 | Programada | 10:20:00 | 16:20:00 | 6.00 | |
| 18/08/2026 | Ejecutada | 16:46:00 | 17:16:00 | 0.63 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |
| 18/08/2026 | Ejecutada | 15:38:00 | 15:46:00 | 0.63 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |
| 17/08/2026 | Programada | 09:20:00 | 15:20:00 | 6.00 | |
| 14/08/2026 | Programada | 10:20:00 | 16:20:00 | 6.00 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 14/08/2026 | Ejecutada | 10:40:00 | 16:17:00 | 5.62 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 12/08/2026 | Programada | 10:20:00 | 16:20:00 | 6.00 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 12/08/2026 | Ejecutada | 20:31:00 | 20:45:00 | 0.23 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |