Buscar Circuitos Glosario

Circuito RCL096

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Jul18 Jun18 May18 Abr18 Mar18 Feb18 Ene18 Dic17 Nov17 Oct17 Sep17 Ago17
Clasificación B B B B B B B B B B B B
Clientes 330 330 330 330 330 330 345 345 345 345 345 345
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
% Servicio 88.86% 89.89% 88.75% 90.43% 87.84% 90.04% 91.19% 91.21% 87.34% 89.97% 92.76% 87.37%
% Sin Servicio 11.14% 10.11% 11.25% 9.57% 12.16% 9.96% 8.81% 8.79% 12.66% 10.03% 7.24% 12.63%
Interrupción Programada (Hrs) 79.00 78.00 86.00 64.00 87.00 77.00 54.00 57.00 92.00 72.00 52.00 86.00
Interrupción Ejecutada (Hrs) 81.30 73.82 82.13 69.85 88.78 72.70 64.30 64.13 92.42 73.18 52.88 92.22
Promedio Interrupción Diarias (Hrs) 2.67 2.43 2.70 2.30 2.92 2.39 2.11 2.11 3.04 2.41 1.74 3.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RCL096
Interrupciones Programadas 63.00
Interrupciones Ejecutadas 12.88
% Ejecución Operativa 20.44%
Detalle de Salidas - Circuito RCL096
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
09/08/2018 Programada 14:20:00 17:20:00 3.00
08/08/2018 Programada 14:20:00 17:20:00 3.00
07/08/2018 Programada 14:20:00 17:20:00 3.00
07/08/2018 Programada 14:20:00 17:20:00 3.00
07/08/2018 Programada 14:20:00 17:20:00 3.00
07/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
06/08/2018 Programada 14:20:00 17:20:00 3.00
05/08/2018 Programada 14:20:00 17:20:00 3.00
05/08/2018 Programada 14:20:00 17:20:00 3.00
04/08/2018 Programada 14:20:00 17:20:00 3.00 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
04/08/2018 Ejecutada 11:51:00 13:04:00 1.88 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
04/08/2018 Ejecutada 11:09:00 11:49:00 1.88 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
03/08/2018 Programada 14:20:00 17:20:00 3.00 GESTION DEMANDA
03/08/2018 Programada 14:20:00 17:20:00 3.00
03/08/2018 Ejecutada 14:22:00 17:21:00 2.98 GESTION DEMANDA
02/08/2018 Programada 14:20:00 17:20:00 3.00 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // GESTION DEMANDA
02/08/2018 Programada 14:20:00 17:20:00 3.00
02/08/2018 Ejecutada 14:21:00 17:23:00 3.07 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // GESTION DEMANDA
02/08/2018 Ejecutada 06:23:00 06:25:00 3.07 DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // GESTION DEMANDA
SECTOR PARQUE DEL ESTE (PARCIAL) calle 1ra de dicho sector,calle provicional 1, calle 11, callejon 1ra 10, callejon 1ra 11