Circuito RCL067
Distribuidora EdeEste - Provincia Monte Plata
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | D | D | D |
| Clientes | 99 | 99 | 98 | 99 | 98 | 100 | 99 | 103 | 108 | 108 | 107 | 107 |
| % Nivel Cobranza | 0.00% | 86.92% | 68.90% | 68.87% | 74.74% | 59.14% | 72.91% | 60.21% | 66.44% | 67.42% | 55.23% | 73.25% |
| % Nivel Pérdida | 0.00% | 89.89% | 88.61% | 87.80% | 88.54% | 87.81% | 88.47% | 85.73% | 88.62% | 89.05% | 89.72% | 88.60% |
| Energía Suministrada (GWh) | 0 | 0.15 | 0.14 | 0.13 | 0.13 | 0.13 | 0.14 | 0.12 | 0.15 | 0.16 | 0.17 | 0.15 |
| Energía Facturada (GWh) | 0 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
| Energía Cobrada (GWh) | 0 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 |
| % Servicio | 95.91% | 96.37% | 96.69% | 95.41% | 96.96% | 98.89% | 97.95% | 96.91% | 97.56% | 98.18% | 98.43% | 97.60% |
| % Sin Servicio | 4.09% | 3.63% | 3.31% | 4.59% | 3.04% | 1.11% | 2.05% | 3.09% | 2.44% | 1.82% | 1.57% | 2.40% |
| Interrupción Programada (Hrs) | 43.00 | 48.00 | 30.00 | 42.00 | 42.00 | 34.00 | 20.00 | 36.00 | 35.00 | 31.00 | 12.00 | 14.00 |
| Interrupción Ejecutada (Hrs) | 29.47 | 26.13 | 23.83 | 33.03 | 21.90 | 8.00 | 15.27 | 22.57 | 17.83 | 13.27 | 11.43 | 17.55 |
| Promedio Interrupción Diarias (Hrs) | 0.97 | 0.86 | 0.78 | 1.09 | 0.72 | 0.26 | 0.50 | 0.74 | 0.59 | 0.44 | 0.38 | 0.58 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 07/07/2026 | Programada | 10:20:00 | 16:20:00 | 6.00 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 07/07/2026 | Ejecutada | 23:39:00 | 23:59:00 | 0.33 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 06/07/2026 | Ejecutada | 22:59:00 | 23:05:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 06/07/2026 | Ejecutada | 22:53:00 | 22:59:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 06/07/2026 | Ejecutada | 20:13:00 | 20:19:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 06/07/2026 | Ejecutada | 00:56:00 | 01:03:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 05/07/2026 | Ejecutada | 21:58:00 | 22:25:00 | 0.83 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 05/07/2026 | Ejecutada | 21:29:00 | 21:45:00 | 0.83 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 05/07/2026 | Ejecutada | 21:17:00 | 21:00:00 | 0.83 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 04/07/2026 | Ejecutada | 19:56:00 | 20:07:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 04/07/2026 | Ejecutada | 16:07:00 | 16:21:00 | 0.42 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 02/07/2026 | Programada | 09:20:00 | 16:20:00 | 7.00 | TRANSMISION - SALIDA DE LINEA 69 KV // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 02/07/2026 | Ejecutada | 15:04:00 | 19:22:00 | 4.93 | TRANSMISION - SALIDA DE LINEA 69 KV // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 02/07/2026 | Ejecutada | 05:11:00 | 05:23:00 | 4.93 | TRANSMISION - SALIDA DE LINEA 69 KV // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 02/07/2026 | Ejecutada | 00:20:00 | 00:46:00 | 4.93 | TRANSMISION - SALIDA DE LINEA 69 KV // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 01/07/2026 | Ejecutada | 23:12:00 | 23:55:00 | 3.53 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 01/07/2026 | Ejecutada | 21:54:00 | 22:00:00 | 3.53 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 01/07/2026 | Ejecutada | 17:03:00 | 19:22:00 | 3.53 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE |
| 30/06/2026 | Programada | 10:20:00 | 16:20:00 | 6.00 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |
| 30/06/2026 | Ejecutada | 14:44:00 | 16:48:00 | 2.07 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR |