Circuito RCL036
Distribuidora EdeEste - Provincia Santo Domingo
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 6240 | 6240 | 6238 | 6242 | 6245 | 6144 | 6205 | 6830 | 6830 | 6830 | 6830 | 6741 |
| % Nivel Cobranza | 0.00% | 129.56% | 137.63% | 123.98% | 150.88% | 119.99% | 121.81% | 0.00% | 0.00% | 0.00% | 113.96% | 115.23% |
| % Nivel Pérdida | 0.00% | 64.61% | 66.61% | 64.84% | 62.69% | 57.68% | 58.82% | 0.00% | 0.00% | 0.00% | 60.41% | 59.29% |
| Energía Suministrada (GWh) | 0 | 4.77 | 4.71 | 4.03 | 3.54 | 3.35 | 3.60 | 0 | 0 | 0 | 5.15 | 4.57 |
| Energía Facturada (GWh) | 0 | 1.69 | 1.57 | 1.42 | 1.32 | 1.42 | 1.48 | 0 | 0 | 0 | 2.04 | 1.86 |
| Energía Cobrada (GWh) | 0 | 2.19 | 2.16 | 1.76 | 1.99 | 1.7 | 1.80 | 0 | 0 | 0 | 2.32 | 2.14 |
| % Servicio | 99.72% | 98.57% | 98.82% | 99.57% | 99.40% | 99.14% | 99.64% | 99.74% | 99.53% | 98.45% | 99.69% | 99.43% |
| % Sin Servicio | 0.28% | 1.43% | 1.18% | 0.43% | 0.60% | 0.86% | 0.36% | 0.26% | 0.47% | 1.55% | 0.31% | 0.57% |
| Interrupción Programada (Hrs) | 6.00 | 4.00 | 3.00 | 0.00 | 9.00 | 4.00 | 0.00 | 0.00 | 6.00 | 6.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.03 | 10.30 | 8.47 | 3.07 | 4.33 | 6.22 | 2.60 | 1.90 | 3.47 | 11.33 | 2.23 | 4.18 |
| Promedio Interrupción Diarias (Hrs) | 0.07 | 0.34 | 0.28 | 0.10 | 0.14 | 0.20 | 0.09 | 0.06 | 0.11 | 0.37 | 0.07 | 0.14 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 17/08/2026 | Ejecutada | 22:34:00 | 22:43:00 | 0.15 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 14/08/2026 | Ejecutada | 06:05:00 | 07:53:00 | 1.80 | DISTRIBUCION (DISPARO/AVERIAS) - RECORRIDO DE LINEA (NO FALLAS) |
| 12/08/2026 | Programada | 09:20:00 | 15:20:00 | 6.00 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 12/08/2026 | Ejecutada | 20:49:00 | 21:13:00 | 0.82 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 12/08/2026 | Ejecutada | 09:53:00 | 10:18:00 | 0.82 | DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |