Circuito RCL034

Distribuidora EdeEste - Provincia Monte Plata


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación D D D D D D D D D D D D
Clientes 542 542 500 500 502 503 505 790 509 511 517 505
% Nivel Cobranza 0.00% 68.94% 83.89% 76.84% 78.75% 97.89% 67.46% 54.05% 74.74% 86.51% 91.15% 69.32%
% Nivel Pérdida 0.00% 87.49% 89.61% 89.09% 89.23% 91.63% 89.08% 85.90% 89.85% 89.85% 90.61% 91.03%
Energía Suministrada (GWh) 0 0.86 0.90 0.85 0.89 1.00 0.92 1.06 0.99 1 0.94 0.99
Energía Facturada (GWh) 0 0.11 0.09 0.09 0.10 0.08 0.10 0.15 0.1 0.10 0.09 0.09
Energía Cobrada (GWh) 0 0.07 0.08 0.07 0.08 0.08 0.07 0.08 0.08 0.09 0.08 0.06
% Servicio 95.76% 97.24% 97.10% 96.85% 92.73% 98.02% 98.33% 97.90% 98.48% 93.34% 92.01% 96.31%
% Sin Servicio 4.24% 2.76% 2.90% 3.15% 7.27% 1.98% 1.67% 2.10% 1.52% 6.66% 7.99% 3.69%
Interrupción Programada (Hrs) 13.00 15.00 5.00 10.00 42.00 0.00 5.00 29.00 5.00 21.00 14.00 14.00
Interrupción Ejecutada (Hrs) 30.97 20.13 21.17 22.98 53.08 14.47 12.20 15.35 11.08 48.63 58.35 26.92
Promedio Interrupción Diarias (Hrs) 1.02 0.66 0.70 0.76 1.75 0.48 0.40 0.50 0.36 1.60 1.92 0.88
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

[BATEY COCINERO] (Calles/Avenidas: Batey Cocinero (Bayaguana))
[EL PUERTO] (Calles/Avenidas: El Puerto (Bayaguana))
[LAS LOMETAS] (Calles/Avenidas: Migracion Las Lometas)
DONA NELLY (Calles/Avenidas: Desvio)
PULGARIN (Calles/Avenidas: Copey, Migracion El Copey, Migracion Pulgarin, Migracion Yuvina)