Circuito RCL032

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 6376 6376 6379 6328 6287 6293 6245 5759 5719 5742 5711 5735
% Nivel Cobranza 0.00% 89.99% 86.50% 106.08% 100.92% 97.41% 96.58% 99.55% 102.85% 92.72% 91.49% 99.88%
% Nivel Pérdida 0.00% 55.75% 52.90% 52.69% 50.13% 52.75% 58.23% 56.67% 56.23% 57.00% 60.42% 59.26%
Energía Suministrada (GWh) 0 4.00 3.41 3.18 3.17 3.49 4 3.66 3.94 4.11 4.31 4.04
Energía Facturada (GWh) 0 1.77 1.61 1.50 1.58 1.65 1.67 1.58 1.73 1.77 1.70 1.65
Energía Cobrada (GWh) 0 1.60 1.39 1.59 1.59 1.61 1.61 1.58 1.78 1.64 1.56 1.64
% Servicio 99.68% 98.18% 99.59% 99.68% 97.25% 99.96% 98.94% 97.76% 98.86% 98.13% 98.13% 99.34%
% Sin Servicio 0.32% 1.82% 0.41% 0.32% 2.75% 0.04% 1.06% 2.24% 1.14% 1.87% 1.87% 0.66%
Interrupción Programada (Hrs) 3.00 11.00 18.00 11.00 0.00 0.00 9.00 12.00 9.00 0.00 3.00 6.00
Interrupción Ejecutada (Hrs) 2.28 13.10 2.97 2.30 19.82 0.32 7.87 16.38 8.35 13.67 13.65 4.78
Promedio Interrupción Diarias (Hrs) 0.08 0.43 0.10 0.08 0.65 0.01 0.26 0.54 0.27 0.45 0.45 0.16
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RCL032
Interrupciones Programadas 3.00
Interrupciones Ejecutadas 0.67
% Ejecución Operativa 22.33%
Detalle de Salidas - Circuito RCL032
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
01/07/2026 Programada 13:20:00 16:20:00 3.00 DISTRIBUCION (MANTTO. CORREC.) - MANTTO. CORRE. EN PT
01/07/2026 Ejecutada 16:57:00 17:21:00 0.40 DISTRIBUCION (MANTTO. CORREC.) - MANTTO. CORRE. EN PT
24/06/2026 Ejecutada 11:12:00 11:28:00 0.27 DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT PEGANDO
FELICIDAD, LOS MINA CENTRO, LOS MINA VIEJO, PIDOCA.