Circuito RCL020

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 2990 2990 2999 3028 3032 3042 3040 3025 3081 3343 3356 3402
% Nivel Cobranza 0.00% 78.61% 84.30% 94.21% 82.86% 99.68% 94.54% 78.52% 98.17% 81.87% 81.58% 85.45%
% Nivel Pérdida 0.00% 88.52% 87.32% 86.25% 83.71% 86.78% 86.46% 86.49% 87.09% 85.57% 86.23% 85.95%
Energía Suministrada (GWh) 0 4.22 3.45 3.09 2.68 3.14 3.32 3.47 3.66 3.62 3.83 3.91
Energía Facturada (GWh) 0 0.48 0.44 0.42 0.44 0.41 0.45 0.47 0.47 0.52 0.53 0.55
Energía Cobrada (GWh) 0 0.38 0.37 0.4 0.36 0.41 0.42 0.37 0.46 0.43 0.43 0.47
% Servicio 98.19% 100.00% 100.00% 99.99% 100.00% 99.87% 99.58% 98.64% 98.79% 89.98% 90.75% 95.38%
% Sin Servicio 1.81% 0.00% 0.00% 0.01% 0.00% 0.13% 0.42% 1.36% 1.21% 10.02% 9.25% 4.62%
Interrupción Programada (Hrs) 0.00 0.00 0.00 12.00 13.00 0.00 0.00 0.00 8.00 0.00 5.00 29.00
Interrupción Ejecutada (Hrs) 13.05 0.00 0.00 0.05 0.00 0.97 3.13 9.90 8.83 73.12 67.55 33.72
Promedio Interrupción Diarias (Hrs) 0.43 0.00 0.00 0.00 0.00 0.03 0.10 0.33 0.29 2.40 2.22 1.11
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito RCL020
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.78
% Ejecución Operativa 0%
Detalle de Salidas - Circuito RCL020
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
04/07/2026 Ejecutada 16:35:00 17:22:00 0.78 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
FILIPINAS, HAZIM, JAPÓN, LAS FLORES, LAS PIEDRAS, PEDRO JUSTO CARRIÓN I, PEDRO JUSTO CARRIÓN III, SANTO ANTÓN, VILLA FARO, VILLA MUNICIPAL, MIRAMAR .