Circuito QUIN102PAL

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C C C C C C C C D C B
Clientes 1644 1642 1563 1748 1748 1755 1757 1755 1715 0 1640 1617
% Nivel Cobranza 119.33% 82.24% 93.43% 121.53% 0.82% 105.26% 78.60% 92.32% 85.33% 107.24% 84.50% 101.65%
% Nivel Pérdida 56.32% 40.72% 41.58% 52.59% 41.05% 43.82% 40.06% 46.80% 40.83% 47.69% 40.72% 52.38%
Energía Suministrada (GWh) 0.7 0.55 0.6 0.69 0.65 0.68 0.69 0.68 0.69 0.66 0.63 0.67
Energía Facturada (GWh) 0.3 0.32 0.35 0.33 0.38 0.38 0.41 0.36 0.41 0.34 0.37 0.32
Energía Cobrada (GWh) 0.36 0.27 0.33 0.4 0 0.4 0.32 0.33 0.35 0.37 0.32 0.33
% Servicio 96.77% 95.93% 92.45% 99.09% 97.11% 95.29% 97.27% 97.21% 96.88% 0.00% 95.29% 98.65%
% Sin Servicio 3.23% 4.07% 7.55% 0.91% 2.89% 4.71% 2.73% 2.79% 3.12% 0.00% 4.71% 1.35%
Interrupción Programada (Hrs) 15.00 23.00 55.00 8.00 10.00 5.00 5.00 4.00 14.00 0.00 9.00 12.00
Interrupción Ejecutada (Hrs) 23.58 29.72 55.14 6.65 21.07 34.39 19.96 20.34 22.80 0.00 34.38 9.84
Promedio Interrupción Diarias (Hrs) 0.78 0.98 1.81 0.22 0.69 1.13 0.66 0.67 0.75 0.00 1.13 0.32
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Palmar (Parcial), Palmar Arriba, Los Guineo, Villa Tabacalera, Pozo Coraasan Los Guineos.