Circuito QUIN102PAL

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación D D D D C C C C C C C C
Clientes 1646 1630 1645 1636 1639 1645 1644 1642 1563 1748 1748 1755
% Nivel Cobranza 0.00% 84.83% 107.05% 76.16% 91.44% 69.05% 119.33% 82.24% 93.43% 121.53% 0.82% 105.26%
% Nivel Pérdida 0.00% 50.67% 61.20% 48.34% 55.57% 47.53% 56.32% 40.72% 41.58% 52.59% 41.05% 43.82%
Energía Suministrada (GWh) 0 0.84 0.88 0.77 0.78 0.63 0.7 0.55 0.6 0.69 0.65 0.68
Energía Facturada (GWh) 0 0.41 0.34 0.4 0.35 0.33 0.3 0.32 0.35 0.33 0.38 0.38
Energía Cobrada (GWh) 0 0.35 0.37 0.3 0.32 0.23 0.36 0.27 0.33 0.4 0 0.4
% Servicio 97.03% 93.18% 97.80% 96.07% 98.37% 96.83% 96.77% 95.93% 92.45% 99.09% 97.11% 95.29%
% Sin Servicio 2.97% 6.82% 2.20% 3.93% 1.63% 3.17% 3.23% 4.07% 7.55% 0.91% 2.89% 4.71%
Interrupción Programada (Hrs) 6.00 24.00 17.00 24.00 5.00 0.00 15.00 23.00 55.00 8.00 10.00 5.00
Interrupción Ejecutada (Hrs) 21.71 49.80 16.08 28.69 11.92 23.12 23.58 29.72 55.14 6.65 21.07 34.39
Promedio Interrupción Diarias (Hrs) 0.71 1.64 0.53 0.94 0.39 0.76 0.78 0.98 1.81 0.22 0.69 1.13
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Palmar (Parcial), Palmar Arriba, Los Guineo, Villa Tabacalera, Pozo Coraasan Los Guineos.