Circuito QUIN102PAL

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación D D C C C C C C C C C C
Clientes 1636 1636 1639 1645 1644 1642 1563 1748 1748 1755 1757 1755
% Nivel Cobranza 0.00% 76.16% 91.44% 69.05% 119.33% 82.24% 93.43% 121.53% 0.82% 105.26% 78.60% 92.32%
% Nivel Pérdida 0.00% 48.34% 55.57% 47.53% 56.32% 40.72% 41.58% 52.59% 41.05% 43.82% 40.06% 46.80%
Energía Suministrada (GWh) 0 0.77 0.78 0.63 0.7 0.55 0.6 0.69 0.65 0.68 0.69 0.68
Energía Facturada (GWh) 0 0.4 0.35 0.33 0.3 0.32 0.35 0.33 0.38 0.38 0.41 0.36
Energía Cobrada (GWh) 0 0.3 0.32 0.23 0.36 0.27 0.33 0.4 0 0.4 0.32 0.33
% Servicio 97.80% 96.07% 98.37% 96.83% 96.77% 95.93% 92.45% 99.09% 97.11% 95.29% 97.27% 97.21%
% Sin Servicio 2.20% 3.93% 1.63% 3.17% 3.23% 4.07% 7.55% 0.91% 2.89% 4.71% 2.73% 2.79%
Interrupción Programada (Hrs) 17.00 24.00 5.00 0.00 15.00 23.00 55.00 8.00 10.00 5.00 5.00 4.00
Interrupción Ejecutada (Hrs) 16.08 28.69 11.92 23.12 23.58 29.72 55.14 6.65 21.07 34.39 19.96 20.34
Promedio Interrupción Diarias (Hrs) 0.53 0.94 0.39 0.76 0.78 0.98 1.81 0.22 0.69 1.13 0.66 0.67
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Palmar (Parcial), Palmar Arriba, Los Guineo, Villa Tabacalera, Pozo Coraasan Los Guineos.