Circuito QCOR101

Distribuidora EdeSur - Provincia Barahona


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 292 292 269 269 275 269 295 356 350 367 367 372
% Nivel Cobranza 0.00% 85.56% 74.38% 89.01% 75.28% 97.53% 72.12% 91.31% 69.41% 70.13% 63.08% 79.40%
% Nivel Pérdida 0.00% 79.90% 77.22% 78.99% 77.20% 75.51% 70.16% 68.30% 63.67% 69.27% 64.44% 69.50%
Energía Suministrada (GWh) 0 0.59 0.55 0.50 0.48 0.40 0.40 0.37 0.38 0.42 0.40 0.46
Energía Facturada (GWh) 0 0.12 0.13 0.10 0.11 0.10 0.12 0.12 0.14 0.13 0.14 0.14
Energía Cobrada (GWh) 0 0.10 0.09 0.09 0.08 0.10 0.08 0.11 0.10 0.09 0.09 0.11
% Servicio 98.66% 96.13% 97.56% 96.59% 95.74% 95.74% 95.87% 97.52% 95.05% 97.29% 97.21% 95.87%
% Sin Servicio 1.34% 3.87% 2.44% 3.41% 4.26% 4.26% 4.13% 2.48% 4.95% 2.71% 2.79% 4.13%
Interrupción Programada (Hrs) 4.00 6.00 12.00 16.00 17.00 17.00 18.00 14.00 18.00 12.00 16.00 23.00
Interrupción Ejecutada (Hrs) 9.64 27.86 17.55 24.53 30.71 30.71 29.71 17.87 35.66 20.16 20.39 30.14
Promedio Interrupción Diarias (Hrs) 0.32 0.92 0.58 0.81 1.01 1.01 0.98 0.59 1.17 0.66 0.67 0.99
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito QCOR101
Interrupciones Programadas 0
Interrupciones Ejecutadas 3.68
% Ejecución Operativa 0%
Detalle de Salidas - Circuito QCOR101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
16/10/2026 Ejecutada 15:28:48 16:24:15 0.92 CAMBIO TRANSFORMADOR MT/BT //
13/10/2026 Ejecutada 21:31:04 22:44:40 1.38 RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA //
13/10/2026 Ejecutada 21:21:40 21:31:00 1.38 RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA //