Circuito PPLA105

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 13378 13378 13347 13357 13365 13316 13302 13289 13194 13203 13186 13085
% Nivel Cobranza 0.00% 94.38% 85.71% 112.77% 94.03% 99.55% 115.86% 98.85% 106.27% 94.85% 93.92% 93.39%
% Nivel Pérdida 0.00% 23.92% 12.09% 22.55% -8.18% 9.71% 14.27% 4.20% 14.22% 9.46% 17.42% 18.45%
Energía Suministrada (GWh) 0 4.84 4 3.87 3.17 3.94 4.21 4.31 5.18 5.14 5.34 5.11
Energía Facturada (GWh) 0 3.68 3.51 3 3.43 3.56 3.61 4.13 4.45 4.66 4.41 4.17
Energía Cobrada (GWh) 0 3.48 3.01 3.38 3.22 3.54 4.18 4.08 4.72 4.42 4.14 3.89
% Servicio 99.71% 99.19% 99.27% 99.78% 97.71% 98.83% 99.87% 97.82% 99.85% 99.41% 99.73% 100.00%
% Sin Servicio 0.29% 0.81% 0.73% 0.22% 2.29% 1.17% 0.13% 2.18% 0.15% 0.59% 0.27% 0.00%
Interrupción Programada (Hrs) 0.00 5.00 0.00 0.00 5.00 6.00 0.00 5.00 0.00 0.00 5.00 7.00
Interrupción Ejecutada (Hrs) 2.10 5.81 5.25 1.61 16.47 8.40 1.00 15.89 1.09 4.29 1.98 0.00
Promedio Interrupción Diarias (Hrs) 0.07 0.19 0.17 0.05 0.54 0.28 0.03 0.52 0.04 0.14 0.07 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PPLA105
Interrupciones Programadas 4
Interrupciones Ejecutadas 7.56
% Ejecución Operativa 189.00%
Detalle de Salidas - Circuito PPLA105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 14:12:30 14:17:59 0.09 DISPARO DESCONOCIDO
04/07/2026 Programada 08:00:00 12:00:00 4 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 16:49:07 16:53:18 2.49 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 14:54:53 15:43:01 2.49 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:17:31 08:54:29 2.49 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
El Arenazo, Ensanche Luperón , Bayardo, Padre Granero, Bello Costero, Cantabria, Mari Vázquez, Sabana Grande, Los Reyes, Plaza Turisol, Cerros del Atlántico, Aros Carrau, Torre Alta, Los Maestros, Urb. Atlántica, Urbanización Pelegrín, Jardines del Atlántico, Costa Atlántica, Urbanización Puerta Roja, Urbanización Atlántica V, Long Beach, Urb. Don Armando, Urb. Lorena II, Urb. Arboleda, Urbanización Marapicá, Urb. Joel, Avenida Luis Ginebra, Urb. Bayardo, Gobernacion de Puerto Plata, Cuartel General de Puerto Plata, Malecon, Palacio de Justicia PP.