Buscar Circuitos Glosario

Circuito PPEL101

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 98.83% 98.76% 98.54% 98.77% 99.20% 99.23% 99.14% 99.19% 99.19% 100.00% 100.00%
% Nivel Pérdida 0.00% 6.66% 2.71% 15.06% -20.85% -2.94% -0.49% -10.79% -0.87% -13.03% 3.62% 11.19%
Energía Suministrada (GWh) 0 4.19 3.86 3.7 3.09 3.69 3.74 3.71 4.06 4.04 4.51 4.35
Energía Facturada (GWh) 0 3.91 3.76 3.15 3.74 3.8 3.76 4.11 4.1 4.57 4.35 3.86
Energía Cobrada (GWh) 0 3.87 3.71 3.1 3.69 3.77 3.73 4.08 4.06 4.53 4.35 3.86
% Servicio 100.00% 99.27% 99.97% 100.00% 99.45% 99.86% 99.98% 98.25% 100.00% 100.00% 99.96% 100.00%
% Sin Servicio 0.00% 0.73% 0.03% 0.00% 0.55% 0.14% 0.02% 1.75% 0.00% 0.00% 0.04% 0.00%
Interrupción Programada (Hrs) 0.00 5.00 0.00 0.00 5.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 5.28 0.24 0.00 3.95 1.02 0.17 12.74 0.00 0.00 0.27 0.00
Promedio Interrupción Diarias (Hrs) 0.00 0.17 0.01 0.00 0.13 0.03 0.01 0.42 0.00 0.00 0.01 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PPEL101
Interrupciones Programadas 5
Interrupciones Ejecutadas 5.28
% Ejecución Operativa 105.60%
Detalle de Salidas - Circuito PPEL101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/05/2026 Programada 11:00:00 16:00:00 5 APERTURA DE LINEA DE TRANSMISION
07/05/2026 Ejecutada 11:12:44 16:29:46 5.28 APERTURA DE LINEA DE TRANSMISION
Puerto Plata Electricidad.