Circuito PORT401
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 180.12% | 0.00% | 99.99% |
| % Nivel Pérdida | 0.00% | -95.22% | -14.59% | 41.23% | 33.50% | -18.39% | 6.51% | 0.95% | 20.33% | 20.13% | 19.88% | -13.48% |
| Energía Suministrada (GWh) | 0 | 0.15 | 0.3 | 0.34 | 0.2 | 0.13 | 0.16 | 0.15 | 0.15 | 0.12 | 0.09 | 0.07 |
| Energía Facturada (GWh) | 0 | 0.29 | 0.34 | 0.2 | 0.13 | 0.16 | 0.15 | 0.15 | 0.12 | 0.09 | 0.07 | 0.08 |
| Energía Cobrada (GWh) | 0 | 0.29 | 0.34 | 0.2 | 0.13 | 0.16 | 0.15 | 0.15 | 0.12 | 0.17 | 0 | 0.08 |
| % Servicio | 100.00% | 100.00% | 99.88% | 100.00% | 99.68% | 99.94% | 100.00% | 99.70% | 99.11% | 99.53% | 100.00% | 99.25% |
| % Sin Servicio | 0.00% | 0.00% | 0.12% | 0.00% | 0.32% | 0.06% | 0.00% | 0.30% | 0.89% | 0.47% | 0.00% | 0.75% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 6.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.86 | 0.00 | 2.29 | 0.41 | 0.00 | 2.22 | 6.50 | 3.40 | 0.00 | 5.50 |
| Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.03 | 0.00 | 0.08 | 0.01 | 0.00 | 0.07 | 0.21 | 0.11 | 0.00 | 0.18 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 02/07/2026 | Ejecutada | 21:23:50 | 23:47:13 | 2.67 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 02/07/2026 | Ejecutada | 17:07:26 | 17:00:00 | 2.67 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |